1 result
-
Stage 1 Neerabup Resource Recovery Precinct
The proposal is for the construction and operation of Stage 1 of the Neerabup Resource Recovery Precinct (NRRP) at Lot 600, 570 Wattle Avenue, Neerabup, approximately 39 km north of Perth CBD. Potential future stages of the NRRP are conceptual and viability still needs to be determined over the long term. The proposal will consist of a new community recycling centre (CRC), waste transfer station (WTS), material recovery facility (MRF) and supporting infrastructure to provide... MoreOpened 15 June 2026
1 result.
Page 1 of 1