731 results
-
Extension of Sand Extraction Lot 1001, Lake Clifton Road, Lake Clifton, Shire of Waroona
Cougar Sand Supplies propose to extend their existing sand and limestone quarry o ver a period of 10 – 15 years. The quarry is located approximately 7.7 kilometres northeast of the Preston Beach townsite in the Shire of Waroona. The proposal is adjacent to the Myalup State Forest and is within an exclusion area under S tate P lanning P olicy 2.4 - Planning for Basic Raw Materials . ... MoreClosed 11 February 2025 -
Port Hedland Iron Project – Stage 1 (formerly Port Hedland Green Steel Project – Stage 1) - Additional Information
Port Hedland Iron Pty Ltd (formerly Port Hedland Green Steel) proposes to develop a large-scale downstream iron ore processing facility via a staged approach . The proposal is located in the Boodarie Strateg i c Industrial Area (BSIA) approximately 10 km south-west of Port Hedland in the Pilbara region. An Environmental Review Document (ERD) has been prepared by Port Hedland Iron in accordance with Environmental Protection... MoreClosed 20 February 2025 -
Mining Area C – Southern Flank Significant Amendment
BHP Iron Ore Pty Ltd is proposing to significantly amend the approved proposal at Mining Area C, located approximately 120 km north-west of Newman. The approved proposal consists of above and below water table mine pits and associated infrastructure, groundwater abstraction, dewatering and surplus water infrastructure, ore processing facilities, ore transportation infrastructure, haul and access roads, and ore and topsoil stockpiles. The significant amendment proposal... MoreClosed 14 March 2025 -
Jimblebar Significant amendment
BHP Iron Ore Pty Ltd is proposing the expansion and amalgamation of existing operations at: Jimblebar Iron Ore Revised Proposal (Ministerial Statement (MS) 1126) Orebody 18 Iron Ore Mine (MS 439, MS 1012) Orebody 31 Iron Ore Mine (MS 1021). The proposal includes the following key activities: Above and below water table mining at the proposed East Jimblebar deposit. An increase in mine dewatering and surplus water at the Jimblebar mine. Additional... MoreClosed 24 March 2025 -
Robe Valley Iron Ore Mine
Robe River Mining Co. Pty. Ltd is seeking to extend the life of operations at Robe Valley, located 146 km southwest of Karratha, in the Pilbara region of Western Australia. The proposal is a significant amendment to the Approved Proposals (MS 776, MS 1112 and MS 1141) and includes the development of new above and below water table iron ore deposits and associated activities to extend the life of the existing operations at Robe Valley. The proposal includes, but is not limited... MoreClosed 24 March 2025 -
Turner River Solar Hub
The Proposal is for the construction and operation of a renewable energy solar generation hub to power Fortescue mining operations in the Pilbara region. It is located approximately 120 km south of Port Hedland and is within the Kariyarra Native Title determination area. The Proposal comprises the installation of solar panels and substation with an estimated total capacity of 644 MW and 220 kV transmission line spurs connecting the Proposal to Fortescue’s existing Pilbara Energy... MoreClosed 3 April 2025 -
Robe Mesa Iron Ore Project
The Robe Mesa Iron Ore Project is a greenfield operation located within the Robe Valley Channel Iron Deposits, adjoining Rio Tinto’s Mesa F deposit, in the West Pilbara of Western Australia, within the Shire of Ashburton, approximately 180 kilometres from the town of Onslow. The proposal involves above water table open pit mining with a total disturbance of 270 hectares of native vegetation within a 903 hectare development envelope. The proposal includes a dry crush and screen... MoreClosed 9 April 2025 -
Ocean Barramundi Expansion Project - Additional Information
Tassal Operations Pty Ltd is proposing the expansion of existing barramundi farm operations at Cone Bay to seven new sites spread across the Buccaneer Archipelago, located north of Broome and Derby in the Kimberely region . The proposal includes the development of sea-cage infrastructure and sea-cage fish production. The proposed expansion will be staged over a 10-year period. Additional assessment information has... MoreClosed 9 April 2025 -
Arrowsmith Hydrogen Project - Additional Information
Infinite Green Energy Limited (IGE) is proposing to construct and operate a renewably powered (wind and solar) hydrogen facility. The proposal is located adjacent to Beekeepers Nature reserve and Brand Highway, approximately 30km South of Dongara in the Sire of Iwin, Western Australia. The Level of Assessment was set at Referral Information with Additional Information (two weeks public review). The additional information published for public review is required for: ... MoreClosed 12 April 2025 -
South Thomson Development Barge Landing Project - Additional Information
Rottnest Island Authority is proposing to extend and redevelop the existing Army Groyne into a barge operations facility in South Thomson Bay at Wadjemup/Rottnest Island. The proposal includes: Dredging for the purpose of construction for a breakwater/laydown area and for a barge turning circle. Use of dredge spoil for re-use as reclamation to create a laydown area. Extension of the existing Army Groyne to create a breakwater. ... MoreClosed 14 April 2025 -
Mulga Downs Iron Ore Mine - Public Environmental Review
Hancock Prospecting Pty Ltd proposing to construct and operate the Mulga Downs Iron Ore Mine. The proposal is located 210 km south of Port Hedland. An Environmental Review Document (ERD) has been prepared by Hancock Prospecting Pty Ltd in accordance with Environmental Protection Authority procedures and is released for public review. The ERD describes the proposal, examines the likely environmental effects and the proposed environmental management procedures... MoreCloses 2 June 2025
731 results.
Page 25 of 25