Browse Carbon Capture and Storage Project
Proposal by Woodside Energy Ltd to develop infrastructure to transport, inject and permanently sequester up to 14,200 tonnes of carbon dioxide (CO 2 ) per day into the Calliance Storage Formation at an expected annual average injection rate of 3-4 million tonnes per annum. Calliance is an underground, rock formation located offshore, 4 km below the seabed and about 425 km north of Broome. The CO 2 would originate from the proposed Browse to North West Shelf Project which... MoreClosed 24 September 2025 -
Perth Entertainment and Sporting Precinct
The proposal is to construct and operate a new multi-use entertainment and sporting precinct at Burswood Park. The precinct will include : a new outdoor amphitheatre for live music and other events ; a multi-use track for motor racing ( including a one 3-day Supercars event per year) , cycling and community sport; a multi-use event building,... MoreClosed 9 October 2025 -
Northern Extension to Yalyalup Mineral Sands Project - Additional Information
Doral Mineral Sands Pty Ltd (Doral) is proposing to expand its current mining operation for the Yalyalup Mineral Sands Project which operates under Ministerial Statement 1168, to include an additional 844.92 hectares of mining adjacent to the existing operation. An Environmental Review Document (ERD) has been prepared by Doral in accordance with Environmental Protection Authority procedures and is released for public review. The ERD describes the proposal, examines the likely... MoreClosed 11 October 2025 -
METRONET on Swan Ferry Service Expansion: Perth to Applecross
The Public Transport Authority of Western Australia (PTA) propose s to expand the Swan River Ferry Network by constructing new ferry infrastructure and services at Matilda Bay and Applecross, and upgrad es to existing infrastructure at Elizabeth Quay . In addition to a new jetty and terminal, construction of the Matilda Bay facility will also include onshore electric charging infrastructure for the ferries, and modifi cation of the existing road layout... MoreClosed 13 October 2025 -
Wind Farm in Scott River
The proposal is for the development of an onshore wind farm and involve s the construction and operation of up to 20 wind turbines, generating up to 100 MW . A ssociated infrastructure includ es meteorological masts and communication towers, operation and maintenance building, substation and transmission infrastructure and other supporting infrastructure. The proposal is located approximately 15 km northeast of the town of Augusta, in the ... MoreClosed 15 October 2025 -
Ministers North Derived Proposal
The proposal is for iron ore mining operations at Ministers North, located approximately 85 km north-west of the Town of Newman. The proposal is located approximately 15 km south-east of BHP’s existing Yandi Mining Operations (Yandi). The proposal is a derived proposal for mining operations at Ministers North authorised by the Pilbara Expansion Strategic Proposal, Ministerial Statement 1105. The proposal includes: Above water table mining in open... MoreClosed 6 November 2025 -
Marri Wind Farm
The proposal is for the development of an onshore wind farm and involves the construction and operation of up to 82 wind turbines, generating up to 550 megawatts (MW). Associated infrastructure includes temporary worker accommodation, a battery energy storage system (BESS), electrical cabling, transmission infrastructure, substation and other supporting infrastructure. The proposal is located approximately 20 km south of Dandaragan, Western Australia. The wind farm substation... MoreClosed 17 November 2025 -
Kalgoorlie Regional Renewable Energy Project
The proposal is for the construction and operation of a renewable wind and solar generation hub to power Northern Star’s Kalgoorlie Consolidated Gold Mines (KCGM) Operations located approximately 10 kilometres (km) northeast of Kalgoorlie-Boulder on mining tenure held by Northern Star. The Proposal comprises the construction and operation of up to 32 turbines and a solar farm of a combined production capacity of 366-megawatt, a 300-megawatt hour battery energy storage system... MoreClosed 27 November 2025 -
Katanning Gold Project
The Proposal is to construct and operate an open cut gold mine approximately 275 km southeast of Perth and 37 km northeast of Katanning, WA. The total disturbance proposed is up to 68.78 hectares (ha), which includes the disturbance of 58.39 ha of native vegetation over a 10-year life of mine. The annual total pit dewatering volume is estimated to be 0.4 gigalitres per year (GL/yr) with a maximum of 0.5 GL/yr. MoreClosed 1 December 2025 -
Tathra Wind Farm
The proposal is for the development of an onshore renewable energy facility and involves the construction and operation of up to 140 wind turbines, generating up to 1,0 00 MW, up to 5 00 MW of solar power generation, battery energy storage system with capacity of up to 500 MW, and associated supporting infrastructure. The proposal is located approximately 15 km east of the town of Eneabba in the Mid West region of Western... MoreClosed 9 December 2025 -
Lots 802 and part Lot 803 Erindale Road, Hamersley - Additional Information
Digital 4 Pty Ltd is proposing the construction of residential housing and associated civil infrastructure, and the establishment of a conservation area. The proposal is located approximately 12 km north of Perth CBD, in the suburb of Hamersley. The additional information package has been prepared by Digital 4 Pty Ltd in accordance with Environmental Protection Authority procedures and is released for public review. The Level of Assessment was set at Referral... MoreClosed 17 December 2025 -
Northern Terminal to Neerabup Terminal 330kV Transmission Line - Additional Information
Western Power is proposing to construct a new 330kV dual circuit transmission line between Northern Terminal in Malaga and Neerabup Terminal in Pinjar, a length of approximately 29 km. The Proposal also includes the expansion of the two existing Western Power substations, Northern Terminal and Neerabup Terminal. The purpose of the Proposal is to reinforce the North Region transmission network to remove constraints on existing connected generation, provide additional capacity to... MoreClosed 22 December 2025