The Mulga Downs Hub and Rail Spur (the Proposal) is located approximately 210 km south of Port Hedland and 180 km northwest of Newman in the Pilbara region of Western Australia. The Proposal is for the development of a hub and rail spur to connect into the existing Roy Hill Railway for the...More
Project Haber Pty Ltd proposes to construct and operate a 1.4 million tonnes per annum (Mtpa) urea plant in East Arrowsmith (South Erregulla). The proposal is located approximately 280 km north of Perth and 45 km south east of Dongara, in the Shire of Three Springs.
The urea plant...More
Image Resources NL proposes to develop a mineral sands extraction project south of Orange Springs Road, Cowalla (Shire of Gingin). The proposal includes progressive and linear dredge mining of the sand resource operating over a 10-year period and the development of temporary waste dumps and...More
The referred proposal is for a change in the use, purpose and condition of land within the Gnangara, Pinjar and Yanchep pine plantations from commercial pine plantation managed for the purpose of timber production to a combination of new uses, purposes and conditions other than pine plantations....More
PSP Properties Pty Ltd propose to develop and operate a surf park at Lots 800 and Lot 9001 Prinsep Road, and Lot 801 Knock Way, Jandakot (City of Cockburn). The proposal includes development of an open water surfing lagoon, accommodation, food and beverage venues, function centre and events...More
Horizon Power is proposing to construct common user transmission infrastructure to enable the supply of grid electricity to the Burrup Strategic Industrial Area (SIA).
The Proposal includes construction of an approximately 7 km long, 132 kV overhead transmission line between the Dampier...More
The City of Gosnells (the Proponent) proposes to extend Garden Street between Harpenden Street and Holmes Street in Southern River, which will involve the construction of an 840 m section of a dual carriageway (two lanes each direction).
The Proposal is located predominantly within the...More
The proposal is for the installation and operation of a Heated Overland Thermal Treatment (‘Hottpad’) system at t he Karratha liquid waste treatment plant and waste transfer station located approximately 6 kilometres south-west of Karratha.
The Hottpad is...More
GM Giacci Family Trust is proposing to extract limestone from Lot 4 Binningup Road, Binningup in the Shire of Harvey. The limestone is proposed to be extracted in seven stages and crushed and screened on site within a 2-5 year period. The proposal includes 26 hectares of...More
Kalgoorlie Consolidated Gold Mines is seeking to expand the Fimiston Gold mine operations (Fimiston), l ocated 600 kilometres East of Perth, and adjacent to the C ity of Kalgoorlie-Boulder, Western Australia.
The proposal is a significant amendment to the...More
The proponent (Hamersley Iron Pty Limited) proposes to build and develop a desalination plant at Parker Point, Dampier, located approximately 2.5km north-east of the Dampier township.
This Proposal will establish a reliable potable water supply for the Proponent’s Dampier...More
Main Roads Western Australia (Main Roads) is proposing to upgrade Tonkin Highway from south of Roe Highway to approximately 1 km north of Kelvin Road to a six-lane dual carriageway. The Proposal will include construction of a half diamond with north facing ramps at the Hale Road intersection...More
The Water Corporation is proposing to construct and operate the Alkimos Seawater Desalination Plant, a 100 gigalitre per annum seawater desalination plant and a 6 gigalitre per annum groundwater treatment plant, at the Alkimos water precinct. The project includes a 33.5 kilometre pipeline...More
Buru Energy Ltd propose to undertake a 2D an d 3D geological survey at one site (Rafael patch) in the west Kimberley district, approximately 80 kilometres south of Derby.
The proposal would include total disturbance of up to 438 hectares by raised blade clearing of 1147...More
Saracen Properties Pty Ltd (representing 5 Star Margaret River Pty Ltd and The Beach Village Pty Ltd) proposes to develop various lots along Wallcliffe Road, Gnarabup for a resort and beach village.
An Environmental Scoping Document (ESD) has been prepared by Emerge Associates...More
Mardie Minerals Pty Ltd is seeking to optimise the Mardie Project which was approved under MS1175. The Mardie Project is a high-volume solar salt and Sulphate of Potash project at Mardie, approximately 80 km south-west of Karratha, in the Pilbara region of Western Australia. The Optimised...More
Mt Weld Mining Pty Ltd proposes to expand the Mt Weld Mine, which includes the construction and operation of a rare earths mine and processing plant , to its life of mine extent.
The expansion proposes to increase the d evelopment e nvelope fro m...More
The public are invited to comment on the draft Terms of Reference ( ToR ) required by the Commonwealth Department of Climate Change, Energy, the Environment and Water under the Environment Protection Biodiversity Conservation Act 1999 ( EPBC Act), and the draft...More
The EPA made this environmental review document available for public review from 20 June 2022 to 15 August 2022.
The EPA has determined that this environmental review document should be made available for an additional 2 weeks commencing 16 August 2022. The closing date for...More
FMG Iron Bridge (Aust) Pty Ltd proposes to extend existing operations at its North Star Magnetite Project , which is subject to Ministerial Statement 993 issued under Part IV of the Environmental Protection Act 1986 . T he proposal is ...More
Main Roads Western Australia is proposing to construct and maintain Stage 4 of the Manuwarra Red Dog Highway ( MRDH ) between Karratha and Tom Price, from Wallyinya Pool (on the existing Roebourne – Wittenoom Road) to the Nanutarra – Munjina Road, adjacent to the...More
Polaris Metals Pty Ltd is proposing to develop a 52-kilometre (km) bitumen sealed haul road running south-north to transport iron ore from its mine, 15km south-east of Marvel Loch to its satellite Koolyanobbing operations.
An Environmental Review Document...More
Synergy Renewable Energy Developments Pty Ltd proposes to develop a wind farm approximately 35 kilometres north-east of Hyden townsite in the Western Australian Wheatbelt.
The proposal consists of up to 30 wind turbines generating up to 150 MW, electrical substations and...More
The EPA is reviewing its Environmental Factor Guideline – Greenhouse Gas Emissions (EFG GHG).
The purpose of the EFG GHG is to communicate how GHG emissions are considered by the EPA in the environmental impact assessment (EIA) process.
Since the guideline was ...More
Onslow Iron Pty ltd ( a wholly owned subsidiary of Mineral Resources Limited ) is proposing to develop a fully sealed private haul road, approximately 125 km in length, starting from about 45 km southwest of Pannawonica to access the Port of Ashburton. Within t he Port, landside and...More
Atlas Iron Pty Ltd (Atlas Iron) is proposing to develop a greenfield iron ore mine at McPhee Creek, located approximately 30 km north of Nullagine townsite on Mining Lease 45/1243 in the Pilbara region of Western Australia.
The McPhee Creek Iron Ore Project (the...More
Simcoa Operations Pty Ltd is proposing to establish a new quartzite mine approximately 15 km north of Moora, in the Wheatbelt region of Western Australia, and 2 km north of the existing mine.
The proposal will include the establishment of an above groundwater mine pit, waste...More
AWE Perth Pty Ltd proposes to undertake a conventional exploration drilling program located south-east of Dongara, Western Australia (WA). The Proposal includes the construction of a single deviated well, immediately adjacent (extending beneath) the Yardanogo Nature Reserve, and within...More
Infinite Green Energy propose to construct and operate a green energy wind and solar powered hydrogen production facility within freehold lots 3, 4, 100 and 6110 located in Arrowsmith 30km south of Dongara, within the Shire of Irwin, Western Australia (WA).
Infinite Blue Energy purchased the...More
The EPA has determined that this environmental review document should be made available for an additional 2 weeks commencing 16 August 2022. The closing date for submissions is 29 August 2022. If you have already made a submission to this current consultation you do not need to do so again....More