Byford Rail Extension - Public Environmental Review

Closed 17 May 2021

Opened 3 May 2021

Overview

The Public Transport Authority (PTA) proposes to construct and operate 8 km of new railway (including dual tracks and associated rail infrastructure), between Armadale and Byford. The proposal includes modification to the existing Armadale Station and construction and operation of a new station at Byford. The proposal includes the replacement of level crossings with grade separated crossings, either road over rail or rail over road, and includes duplication of the rail bridge over Wungong Brook. 

The proposal involves clearing of up to 16 hectares (ha) of vegetation and fauna habitat within a 165 ha development envelope.

Areas

  • All of Western Australia

Audiences

  • Public

Interests

  • Public Environmental Review