Balla Balla Infrastructure Rail and Conveyor Project, Pilbara
Feedback updated 27 Feb 2015
We asked
Public comment was invited on the referral to help the EPA determine the appropriate level of assessment.
You said
There was one comment on this referral.
We did
The EPA determined to assess the proposal at the level of API-A as the proposal raises a limited number of key environmental factors that can be readily managed, and for which
there is an established condition setting framework.
Overview
Forge Resources Swan Pty Ltd proposes to construct and operate a railway line (approximately 160 kilometres (km) in length) and conveyor line (approximately 40 km in length), running from the Pilbara Iron Ore Project (operated by Flinders Mines Ltd) north to the Balla Balla Infrastructure Port.
What happens next
Following the seven day public comment period and consideration of any comments received, the EPA will decide whether or not this proposal requires environmental impact assessment and, if so, what level of assessment will be applied.
The Chairman's decisions on level of assessment are released each Monday on the EPA's website.
Areas
- All of Western Australia
Audiences
- Public
Interests
- Seven-day comment on referrals
Share
Share on Twitter Share on Facebook