Blacksmith Transport Infrastructure and Services Corridor

Overview

PIOP Mine Co Pty Ltd (PIOP) proposes to construct and operate a transport infrastructure and services corridor, and associated infrastructure, to facilitate the transport of iron ore from the existing Blacksmith Iron Ore Mine (authorised under Ministerial Statement 924) to the Solomon Iron Ore Mine (authorised under Ministerial Statement 1062) for processing and supply power from Solomon to support the Blacksmith Project.

The proposal includes an approximately 30 kilometre (km) overland conveyor, a 220 kV powerline, water infrastructure, expansion of the existing Bonnie Doon camp and construction of a mine access road.

The proposal would require disturbance of up to 1,259.16 hectares (ha) within a 6,264.26 ha development envelope.

Why your views matter

At this initial stage of the EIA process, comment is simply sought on whether or not the EPA should assess a proposal and, if so, what level of assessment is considered appropriate.

To receive updates about this proposal or scheme, you must subscribe to email notifications through the EPA's website. Email subscription is the only way you will be notified of updates.

Closes 22 Nov 2026

Opened 16 Nov 2026

Areas

  • All of Western Australia

Audiences

  • Public

Interests

  • Seven-day comment on referrals