Kadathinni Wind Farm
Overview
The proposal is for the development a wind farm and involves the construction and operation of up to 68 turbines, battery energy storage system (BESS), and ancillary infrastructure.
The proposal is located approximately 10 kilometres west of the town of Three Springs. The proposal will connect via an existing Western Power transmission line to the South West Interconnected System (SWIS).
The proposal has an indicative disturbance footprint of 1,151.8 hectares (ha) within a 14,893.3 ha development envelope. The proposal will include the clearing of no more than 7.45 ha of remnant native vegetation and 9.04 ha of planted vegetation (native and non-native).
Why your views matter
At this initial stage of the EIA process, comment is simply sought on whether or not the EPA should assess a proposal and, if so, what level of assessment is considered appropriate.
To receive updates about this proposal or scheme, you must subscribe to email notifications through the EPA's website. Email subscription is the only way you will be notified of updates.
Give us your views
Areas
- All of Western Australia
Audiences
- Public
Interests
- Seven-day comment on referrals