Katanning Gold Project
Overview
The Proposal is to construct and operate an open cut gold mine approximately 275 km southeast of Perth and 37 km northeast of Katanning, WA. The total disturbance proposed is up to 68.78 hectares (ha), which includes the disturbance of 58.39 ha of native vegetation over a 10-year life of mine. The annual total pit dewatering volume is estimated to be 0.4 gigalitres per year (GL/yr) with a maximum of 0.5 GL/yr.
Why your views matter
At this initial stage of the EIA process, comment is simply sought on whether or not the EPA should assess a proposal and, if so, what level of assessment is considered appropriate.