Waitsia Gas Project Stage 2
Overview
The Waitsia Gas Project Stage 2 is a conventional gas proposal located approximately 16km East-South-East of the Dongara-Port Denison town sites.
The proposal includes clearing of up to 17 ha of native vegetation to support the following:
- Construction and operation of a new gas processing plant with a maximum export capacity of 250 terajoules per day;
- Drilling of up to 6 new production wells to supplement the existing 2 wells;
- Installation of a gas gathering system comprising of flowlines and hubs; and
- Installation of a flowline from the proposed gas plant for water reinjection via a disused petroleum production well.
Why your views matter
At this initial stage of the EIA process, comment is simply sought on whether or not the EPA should assess a proposal and, if so, what level of assessment is considered appropriate.
What happens next
Following the seven day public comment period and consideration of any comments received, the EPA will decide whether or not this proposal requires environmental impact assessment and, if so, what level of assessment will be applied.
The EPA's decisions on level of assessment are released each Monday on the EPA's website.
Areas
- All of Western Australia
Audiences
- Public
Interests
- Seven-day comment on referrals
Share
Share on Twitter Share on Facebook