Walpole New Source Borefield Water Abstraction Trial

Closed 23 Aug 2023

Opened 17 Aug 2023

Overview

Water Corporation propose to conduct a 6- month water source abstraction trial to assess the long-term viability of a new water source for Walpole, Western Australia. The trial will be conducted during the summer peak water demand period and will use existing infrastructure.  

The source comprises three existing deep fractured rock bores located within the following Water Corporation Lots: 

• Bore 5/09 is located within the Swan Road road reserve 

• Bore 3/20 is located within part of Lot on Plan P209284 12737 

• Bore 5/20 is located within part of Lot on Plan P064982 86 

The abstraction bores will be operated up to 24 hours, seven days a week to produce a total groundwater volume of up to 415 kilolitres (kL)/day at an abstraction rate of up to 4.6 L/s.

Why your views matter

At this initial stage of the EIA process, comment is simply sought on whether or not the EPA should assess a proposal and, if so, what level of assessment is considered appropriate.

What happens next

Following the seven day public comment period and consideration of any comments received, the EPA will decide whether or not this proposal requires environmental impact assessment and, if so, what level of assessment will be applied.

The EPA's decisions on level of assessment are released each Monday on the EPA's website.

Areas

  • All of Western Australia

Audiences

  • Public

Interests

  • Seven-day comment on referrals