Find activities

715 results

  • Orebody 29/30/35 Significant Amendment

    The Orebody 29/30/35 Significant Amendment proposal is approximately 7 kilometres west-south-west of Newman in the Pilbara region next to existing Mt Whaleback mining operations. BHP Iron Ore Pty Ltd proposes to continue and expand existing iron ore mining operations approved under Ministerial Statement 963: Orebody 29/30/35 Mining Below Watertable, published 18 March 2014. The proposal includes the expansion of operations at Orebody 29 and 30 (above and below the water... More
    Closed 18 December 2024
  • Keysbrook Motorsport Facility - Public Environmental Review

    The Stati Group of Companies (the proponent) is proposing to construct and operate a multi-use motorsport complex on Lot 78 Punrak Road Keysbrook. To support the facility, the proponent plans to develop the adjacent Lot 400 Wigg Road Keysbrook to include storm water management infrastructure, drainage and weather dependent car park facilities. The proposal would be used for road safety driver training, amateur car events, a go-kart track, V8 supercar events, motorbikes and world rally... More
    Opened 16 December 2024
  • Smiths Beach Project, Yallingup - Coastal Tourism Village - Public Environmental Review

    Smiths 2014 Pty Ltd is proposing to the development of a coastal tourism village (incorporating tourism, commercial and holiday home uses) . The proposal is located on Smiths Be a ch Road in Yallingup . An Environmental Review Document (ERD) has been prepared by JBS&G in accordance with Environmental Protection Authority procedures and is released for public review.  The ERD describes the proposal, examines the... More
    Opened 16 December 2024
  • Metropolitan Region Scheme Amendment 1388/57 Wattle Grove (South) Precinct - Environmental Review

    The Western Australian Planning Commission ( WAPC ) intends to amend the Metropolitan Region Scheme (MRS) for land in the City of Kalamunda and is seeking public comment. The amendment proposes to rezone approximately 123.5 hectares of land in Wattle Grove from the ‘ Rural ’ zone to the ‘ Urban ’ zone. The proposed ‘ Urban ’ zone will facilitate future residential and areas of public open space, following... More
    Closed 9 December 2024
  • Urban Development of Lots 11 and 74 Beenyup Road, Banjup - Additional Information

    The Trustee for Aigle Royal Group Discretionary Trust (Aigle Royal Group) (the proponent) is proposing the urban development of Lots 11 and 74 Beenyup Road, Banjup, which will include a 4.63 hectare (ha) residential and urban area, and a 21.55 ha conservation reserve. The proposal is located within the City of Cockburn local government area and is approximately 27 km south of Perth Central Business District (CBD). The Level of Assessment was set at Referral Information... More
    Closed 6 December 2024
  • Telfer-Havieron Gold Mining Project - Additional Information

    Newcrest Mining Limited is proposing to expand the Telfer Gold Mine to include the Havieron underground mine, within a development envelope encompassing both t he Telfer -Havieron opera tions and inclusive of haul road for trucking of ore from Havieron to Telfer for processing, waste rock landforms, evaporation ponds and expanded ground water abstraction, for a combined total of 32 million tonnes of ore production . The proposal is located about 400 km... More
    Closed 4 December 2024
  • Outer Harbour Port Development, Kwinana – Environmental Scoping Document

    The Director General of the Department of Transport on behalf of the State of Western Australia is proposing to construct and operate a new multimodal port in the Kwinana Industrial Area (KIA), approximately 30 km south of Perth. The Proposal is primarily located within Cockburn Sound and includes: A port facility. Adjacent areas of landside development. An offshore breakwater. Dredging for a second main channel. ... More
    Closed 28 November 2024
  • Cockatoo Island Multi-User Supply Base - Additional Information

    Kimberley Technology Solutions Pty Ltd is proposing to develop a multi-user supply base comprised of an upgraded airfield, a wharf, a subsea workshop and supporting infrastructure . The proposal is located on Cockatoo Island approximately 7 km off the Western Australian coast within the Buccaneer Archipelago, approximately 130 km north of Derby . A Revi s e d Supporting Document (R S D) has been prepared by Kimberley Technology... More
    Opened 26 November 2024
  • Hemi Gold Project - Additional Information

    De Grey Mining Limited is proposing to construct and operate the Hemi Gold Project (the Project) located approximately 85 km south of Port Hedland, in the Pilbara Region of WA. A Referral Supporting Document (RSD) has been prepared by De Grey Mining Limited in accordance with Environmental Protection Authority procedures and is released for public review. The Level of Assessment was set at Referral Information with Additional Information (4 weeks public review).... More
    Opened 25 November 2024
  • Narrogin Windfarm

    Development of a wind farm approximately 7 km east of the township of Williams and 9 km west of the township of Narrogin in Western Australia. The Proposal will involve the construction and operation of up to 25 turbines, a battery energy storage system (BESS) and ancillary infrastructure. It is located across numerous freehold properties that are primarily cleared for agricultural purposes. The proposal includes no more than 7.41 ha of remnant native vegetation... More
    Closed 24 November 2024
  • Abstraction of groundwater from the Millstream water reserve

    Proposal by the Water Corporation to renew a groundwater licence to continue abstraction from the Millstream aquifer of 6 gigalitres per annum (GL/a). The Water Corporation hold an existing temporary groundwater licence to abstract 3GL/a from the Millstream aquifer until February 2027 (GWL205069), enabling combined abstraction of up to 9GL/a. The referrer of the proposal contends that this significantly exceeds the Department of Water and Environmental Regulation’s sustainable limit of... More
    Closed 20 November 2024
  • Gnarabup Tourism Development – Resort and Beach Village - Public Environmental Review

    Saracen Properties Pty Ltd ( representing 5 Star Margaret River Pty Ltd and The Beach Village Pty Ltd) is proposing to develop a five star resort and beach village, comprising short stay accommodation, residential dwellings and commercial premises . The proposal is located over various lots along Wallcliffe Road, Gnarabup . An Environmental Review Document (ERD) has been prepared by the proponent in accordance with ... More
    Closed 18 November 2024
  • Western Green Energy Hub

    The Western Green Energy Hub is a proposal to design, construct and operate a large-scale wind and solar power project to produce value added products, with the base case assuming green ammonia production. The proposal is situated on WA Mirning Native Title determined land in the far southeast of Western Australia in the Shire of Dundas and City of Kalgoorlie-Boulder, to the northwest of Eucla in the South Coast Region. The proposal will be located on Unallocated... More
    Closed 17 November 2024
  • Kennedy Bay Public Jetty

    The proposal is for constructing and operating a recreational jetty in Port Kennedy, located in south Warnbro Sound with the City of Rockingham, Western Australia. The Jetty proposal will provide: an elevated main deck low-level short-stay vessel berth central jetty ‘node’ to include a diving platform, terracing, stairs, swimming platform, ladders demarcated swimming area More
    Closed 12 November 2024
  • Limestone Quarry Lot 1794 Finn Rd, Myalup

    MGM Bulk Pty Ltd propose to operate a sand and limestone quarry within an approximately 9.17-hectare (ha) area . It will be excavated to approximately 6 m Australian Height Datum (AHD 1 ) from a maximum height of 16.5 m AHD in five stages, each approximately 2 ha in size. The boundaries of the subject site will be designed with a minimum of 1:4 batters. The proposal is located approximately 20 km north-west of the Harvey town centre . ... More
    Closed 3 November 2024
  • Cambridge Gulf Marine Sand Proposal

    The proposal is to source marine sands from Cambridge Gulf, north of Wyndham in northeast Western Australia, for export to overseas construction projects. The proposal is a vessel-based marine operation with a lifespan of up to 15 years. It does not involve the construction and operation of any shore-based facilities. The operation will involve a Sand Production Vessel (SPV) based generally on the design of a large Trailer Suction Hopper Dredger (TSHD). The... More
    Closed 7 October 2024
  • Valhalla Gas Exploration and Appraisal Program - Public Environmental Review

    Bennett Resources (a wholly owned subsidiary of Black Mountain Energy) is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to twenty wells in a region of the Canning Basin that has been... More
    Closed 7 October 2024
  • Clearing Permit Application at Myara North

    Alcoa of Australia Limited’s (Alcoa) clearing permit application ( CPS 10626/1 ) to the Department of Energy, Mines, Industry Regulation and Safety is for the clearing of native vegetation for geotechnical investigations . Under the original CPS application , referred to the EPA, Alcoa sought to clear 20 hectares of native vegetation (ha) . H owever , Alcoa has since amended the application to reduce the area to 11ha. ... More
    Closed 11 September 2024
  • Perdaman Lateral Project

    The Proposal occurs approximately 20 kilometres north of Karratha within an existing industrial area designated as a service corridor within the Burrup Strategic Industrial Area of the Burrup Peninsula. The Project involves the construction of a 550 meter pipeline and associated supporting infrastructure to transport a maximum of 150 TJ of natural gas per day from the Dampier to Bunbury Natural Gas Pipeline to the proposed Perdaman Urea Plant development. The key components... More
    Closed 9 September 2024
  • South Thomson Development Barge Landing Project

    The Proposal is to extend and redevelop the existing Army Groyne into a barge operations facility in South Thomson Bay at Wadjemup / Rottnest Island. The Proposal includes: Dredging for the purpose of construction for a breakwater/laydown area and for a barge turning circle. Use of dredge spoil for re-use as reclamation to create a laydown area. Extension of the existing Army Groyne to create a breakwater. Barge landing ramp. Ferry... More
    Closed 5 September 2024
  • Geraldton Port Maximisation Project

    The Mid West Ports Authority is proposing marine infrastructure upgrades at the Port of Geraldton. The Proposal has a disturbance footprint of up to 38 hectares (ha), of which 17 ha is a new footprint and 21 ha the existing port, within a 75 ha development envelope. The Proposal is a significant amendment to the Geraldton Port Enhancement Project and Preparatory Works for the Town Beach Foreshore Redevelopment (Original Proposal) (Ministerial statement 600), and consists of: ... More
    Closed 5 September 2024
  • Mount Gibson Gold Project

    Crimson Metals Pty Ltd is proposing to develop the Mount Gibson Gold Project, located approximately 280 km northeast of Perth and less than 10 km east from the Great Northern Highway, in the Avon Wheatbelt region of Western Australia. Substantial mining occurred in the 1980’s and 1990’s and as a result, historical disturbance and infrastructure remain in the area. The proposal encompasses the re-opening and enlargement of existing open cut mines, utilisation of existing... More
    Closed 24 July 2024
  • Woodie Continued Operations Project - Additional Information

    Consolidated Minerals Pty Limited is proposing th e expansion of the existing Woodie Woodie Manganese Mine operations (Pilbara Manganese Pty Ltd, a wholly-owned subsidiary of Consolidated Minerals Pty Ltd) which is not subject to a Ministerial Statement issued under Part IV of the Environmental Protection Act 1986. T he proposal is located approximately 100 km east of Marble Bar and Nullagine and 400 km south east of Port Hedland in the Pilbara region of Western Australia. ... More
    Closed 22 July 2024
  • Alicia & Dreadnought Mine Extension Project

    The Proposal involves the reactivation and expansion of a gold mining area approximately 2.5 kilometres south of Coolgardie in the Goldfields region of Western Australia. Key elements include the development of the Alicia open pit, expansion of the Dreadnought open pit and waste rock landform, haul road and ancillary infrastructure. Mined ore will be hauled for processing at the nearby Three Mile Hill plant, with tailings to be deposited in existing tailings storage facilities.... More
    Closed 10 July 2024
  • Casuarina Boat Harbour

    This document has been prepared for the first future derived proposal of the Koombana B ay M arine S tructures Strategic Proposal (Assessment Number 2049 and Ministerial Statement 1226), namely the Casuarina Boat Harbour (Figure 1 Proposal Content Document ). This document supports the Department of Transport’s (DoT’s) request to the Environmental Protection Authority (EPA) under section 38E of the Environmental Protection Act 1986 (EP... More
    Closed 8 July 2024
  • NiWest Nickel Cobalt Project

    Alliance Nickel Ltd is proposing to develop the NiWest Nickel Cobalt Project, a greenfield nickel and cobalt mine located approximately 50 km southeast of Leonora, near Mount Kilkenny. The primary product of the mine, nickel sulphate, is to be exported for use in the manufacturing of batteries in electric vehicles. The proposal includes the development of mine pits and associated infrastructure, including but not limited to, a borefield, temporary waste rock landforms,... More
    Closed 4 June 2024
  • Northern Extension to Yalyalup Minerals Sands Project

    The proposal includes the expansion of a mineral sands mine including mine pits with dewatering to facilitate dry mining techniques. Existing processing facilities, services and support infrastructure will be utilised. Mine voids will be progressively backfilled with sand and clay tailings and rehabilitated to pre-disturbance landuse (i.e. pasture). More
    Closed 24 April 2024
  • North Kiaka Quartzite Mine - Additional Information

    SIMCOA Operations Pty Ltd. is proposing the North Kiaka Project, a quartzite mine approximately 15 km north of the Town of Moora, within the Shire of Moora. The revised proposal is expected to generate up to 130,000 tonnes per annum of lump quartz for downstream processing at the Kemerton Silicon Smelter, located in the Kemerton Strategic Industrial Area, 17 km north-east of Bunbury, WA. The proposal will extend SIMCOA’s operations by 18 years. The proposal will be an open-cut... More
    Closed 24 April 2024
  • Fimiston Gold Mine Operations Extension (Stage 3) and Mine Closure Planning: Revised Proposal - Fimiston South Project - Additional Information

    Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) is seeking to ex tend its existing Fimiston Gold mine operations in Kalgoorlie by widening and deepening the Superpit known as Ivanhoe Cutback , located 600 kilometres (km) east of Perth , and adjacent to the city of Kalgoorlie-Boulder, Western Australia. An Environmental Review Document (ERD) has been prepared by KCGM in accordance with Environmental... More
    Closed 24 April 2024
  • Yarnima Power Station Stage 4 (Gas Reciprocating Engines)

    The proponent, BHP Iron Ore Pty, proposes to increase power generation capacity at the existing Yarnima Power Station, approximately 2 kilometres north-west of Newman in the Pilbara. The proposal comprises an increase in installed firm power generation capacity from 154 megawatts up to 239 megawatts via installation of gas reciprocating engines and associated infrastructure. The gas reciprocating engines are proposed to be installed in stages up to a maximum of 120 megawatts (nominal). ... More
    Closed 21 April 2024
715 results. Page 1 of 24