  • Kwinana Bulk Terminal Redevelopment - Marine Infrastructure

    Fremantle Ports propose to construct and operate new marine infrastructure associated with the Kwinana Bulk Terminal (KBT) by developing a new bulk import and export wharf to replace the existing Kwinana Bulk Berth 2 jetty. The KBT Redevelopment is located within the Kwinana Strategic Industrial Area, approximately 30 km south of Perth, Western Australia. The proposal includes the following elements: A new wharf with two ship berths. Ancillary access... More
    Closes 17 September 2026
  • Newman Source Water Upgrade

    The proposal is an expansion of an existing water supply borefield at Newman. The proposal forms part of the Newman Hub and the proponent has requested that the proposal be declared a derived proposal under the Pilbara Expansion Strategic Proposal approved under Ministerial Statement 1105. The proposal is to develop the Homestead West borefield, approximately 7 kilometres northwest of Newman, to ensure ongoing supply of potable water to the town of Newman and to support BHP’s... More
    Closes 20 September 2026
  • Ravensthorpe Nickel Project Revised Proposal - change to proposal under s.43A

    First Quantum Minerals Australian Nickel Pty Ltd (FQMAN) is proposing to amend their proposal (Assessment 2100) during assessment to expand the existing extent of the Southern Mine and Processing area to accommodate an extension of their Tailing Storage Facility (TSF), known as TSF 3, provision for additional evaporation pond area, and provision for additional topsoil storage area. The proposal is located 35km East of Ravensthorpe. The referred proposal was... More
    Closes 22 September 2026
  • Mount Gibson Gold Project - Public Environmental Review

    Crimson Metals Pty Ltd is proposing to develop the Mount Gibson Gold Project, located approximately 280 kilometres (km) northeast of Perth and less than 10 km east from the Great Northern Highway, in the Avon Wheatbelt region of Western Australia. Substantial mining occurred in the 1980’s and 1990’s and as a result, historical disturbance and infrastructure remain in the area. The proposal comprises the re-opening and expansion of existing open cut mines, use of existing... More
    Closes 27 September 2026
  • Cataby Power Station - Public Environmental Review

    Alinta Energy is proposing to construct a gas-fired power station connected to the State-owned South-West Interconnected System. The proposal is loca ted on freehold land approximately 135 km north of Perth. An Environmental Review Document (ERD) has been prepared by Alinta Energy in accordance with Environmental Protection Authority procedures and is released for public review. The ERD describes the proposal, examines the likely environmental effects and the... More
    Closes 29 September 2026
  • Winu Project - Public Environmental Review

    Winu Services Pty Ltd (a wholly owned subsidiary of Rio Tinto Limited) is proposing to develop the Winu Project (the proposal). The proposal is a new copper-gold mine located approximately 300 kilometres (km) south of Broome and 320 km east of Port Hedland in the northern Pilbara region of Western Australia. An Environmental Review Document (ERD) has been prepared by Winu Services Pty Ltd in accordance with Environmental Protection Authority (EPA) procedures and is released... More
    Closes 22 October 2026
  • Gascoyne Gateway Marine Complex - Public Environmental Review

    Gascoyne Gateway Ltd proposes to build, own and operate a multipurpose marine complex in Exmouth that will service a variety of vessels including but not limited to cruise liners and associated ecotourism activities, Defence and marine supply vessels. The project will not be utilised for livestock or iron ore. The Proposal site is located 10 kilometres south of the Exmouth township and immediately south of the Ingram Street light industrial area; opposite the Exmouth landfill... More
    Closes 16 November 2026