Closed Consultations

685 results

  • Gonneville Nickel-Copper-Platinum Group Element (PGE) Project

    Chalice Mining Limited proposes development of the Gonneville Nickel-Copper-Platinum Group Element (PGE) Project. The proposal is located within the Wheatbelt Region, approximately 70km north-east of Perth, 25 km west of Toodyay and 25 km south-east of Bindoon. The proposal comprises of a mine site including an open mine pit and/or underground mine and infrastructure corridor options for water and power supply. Road and/or existing rail infrastructure will be utilised in... More
    Closed 14 April 2024
  • Wharf Extension

    Kimberly Ports Authority (KPA) is proposing to undertake several improvements and modifications (works) to the wharf at the Port of Broome (the Port) to maximise wharf space and facilities while assisting with safe and efficient operations. The works include the construction of a new wharf laydown and new offices and amenities. The Port is located near Entrance Point at the tip of the Broome Peninsula, north-west of Roebuck Bay and approximately 5 k ilometres (km) south-west... More
    Closed 14 April 2024
  • Lockyer Conventional Gas Project

    Energy Resources Ltd proposes a conventional gas project, to construct and operate a gas processing plant and pipeline in the Mid-West region of Western Australia, approximately 350 km north of Perth, 25 km east of Dongara and 15 km west of Mingenew. The proposal comprises the construction and operation of a natural gas processing facility with a nominal production capacity of 250 terajoules per day, up to six (6) natural gas production wellheads, and an infield gathering... More
    Closed 9 April 2024
  • Residential development of part Lots 11 and 74 Beenyup Road Banjup

    Aigle Royal Developments proposes to develop s Lot 11 and 74 Beenyup Road Banjup for residential and associated purposes. The proposal includes development of 4.44 hectares (ha) for residential development and public open space, and a 2.62 ha conservation area More
    Closed 8 April 2024
  • Kemerton Power Station Increased Operation Hours

    The proposal is to increase the hours of operation of the existing Kemerton Power Station from 2,000 hours/annum to 13,800 hours/annum. The proposal does not involve any clearing, construction, commissioning or development of new equipment or infrastructure. More
    Closed 4 April 2024
  • Outer Harbour Port Development, Kwinana

    The Proposal is to construct and operate a new multimodal port in the Kwinana Industrial Area (KIA), approximately 30 km south of Perth. The Proposal includes: A port facility. Adjacent areas of landside development. An offshore breakwater. Dredging for a second main channel. Dredging for access channels, turning basins and berthing areas. Use of dredge material for beneficial re-use and, where required, placement... More
    Closed 25 March 2024
  • Anketell Road Upgrade (Leath Road to Kwinana Freeway)

    Main Roads is proposing to upgrade and widen Anketell Road to an Expressway Standard for approximately 7.5 km between Leath Road and Kwinana Freeway in the City of Kwinana, WA. The Proposal will include grade separated interchanges at six locations, grade separation of road over rail at two locations and other supporting road infrastructure . More
    Closed 24 March 2024
  • Holiday Accommodation Lot 660 La Perouse Court, Goode Beach

    The proposal is for the development of eco-friendly touris m accommodation including holiday units, a restaurant/function centre , and associated facilities, at Lot 660 La Perouse Court, Goode Beach. The propos ed development envelope is 7.71 hectares (ha) and includes a 2.23 ha clearing footprint, a 0.402 ha wastewater reticulation zone , and a 5.02 ha conservation area. The proposal is located ... More
    Closed 13 March 2024
  • Northern Terminal to Neerabup Terminal 330kV Transmission Line

    The Northern Terminal (NT) to Neerabup Terminal (NBT) 330kV Transmission Line proposal (the Proposal) is located approximately 13 km north of Perth in the City of Swan and City of Wanneroo. The Proposal is for the construction of a new 330kV dual circuit transmission line between NT in Malaga and NBT in Pinjar, a length of approximately 29 km. The purpose of the proposal is to reinforce the North Region transmission network to remove constraints on existing connected generation and... More
    Closed 7 March 2024
  • West Angelas Revised Proposal - Public Environmental Review

    Robe River Mining Co. Pty. Ltd (a wholly owned subsidiary of the Rio Tinto Group) is proposing to extend the existing West Angelas Iron Ore Mine, including developing new above and below water table pits and associated infrastructure to sustain the existing operations (the proposal). The proposal is located is located approximately 130 km northwest of the town of Newman in the East Pilbara region of Western Australia (WA) within the Yinhawangka and Ngarlawangga Peoples Native... More
    Closed 6 March 2024
  • Rhodes Ridge Iron Ore Project

    The Proposal is for the development of the Rhodes Ridge Iron Ore Project (the Proposal), located approximately 40 kilometres north-west of Newman, in the Shire of East Pilbara. The Proposal requires a disturbance footprint of up to 14,850 hectares within a 61,301 hectares Development Envelope. The Proposal includes the development of new above and below water table deposits, and associated activities. The proposal includes but is not limited to: development of new... More
    Closed 14 February 2024
  • Mt Keith Power Station Capacity Expansion Project

    Southern Cross Energy (TransAlta) proposes to construct and operate up to 150 megawatt of gas reciprocating engines and associated infrastructure in the Northern Goldfields region of Western Australia (the proposal), approximately 90 kilometres (km) north of Leinster and 80 km south of Wiluna. The proposal will be a component of TransAlta’s existing Southern Cross Energy North (SCEN) network supplying power to BHP Nickel West and potential third-party operators. The proposal... More
    Closed 14 February 2024
  • Garden Street Extension, Southern River - Additional Information

    The City of Gosnells (the Proponent) proposes to extend Garden Street between Harpenden Street and Holmes Street in Southern River, which will involve the construction of an 840 m section of a dual carriageway (two lanes each direction). The Proposal is located predominantly within the suburb of Southern River, approximately 17 km south-east of Perth Central Business District (CBD) and intersects within Bush forever site 125 (Holmes Street Bushland) , and... More
    Closed 31 January 2024
  • HyEnergy® Green Hydrogen and Ammonia Project

    Province Resources Ltd propose to use combined onshore wind and solar energy to produce green hydrogen and ammonia for export to the green energy market. The proposal is distributed across 3 distinct locations within the Shire of Carnarvon, Western Australia. The proposal will comprise the following major elements: up to 945 ha (6.8 GW) of wind turbines and up to 10,000 ha of solar arrays (5.2 GW) a new multiuser port facility with a material offloading... More
    Closed 21 January 2024
  • Jimblebar Hub Significant Amendment

    The Proposal includes the expansion and amalgamation of existing operations at: Jimblebar Iron Ore Revised Proposal (Ministerial Statement (MS 1126), Orebody 18 Iron Ore Mine (MS 439, MS 1012), Orebody 31 Iron Ore Mine (MS 1021), to include new above and below water table mining, overburden storage areas, beneficiation plant, overland conveyor, creek diversions, haul and access roads, pipelines and associated infrastructure. All mines and... More
    Closed 15 January 2024
  • Hope Downs 2 Proposal - Public Environmental Review

    Hamersley HMS Pty Ltd is proposing to develop a new iron ore mine, Hope Downs 2 (the Proposal). The Proposal includes the development, operation and closure of two above water table (AWT) iron ore deposits (Hope Downs 2 and Bedded Hilltop) and associated infrastructure. Ore will be transported to the Hope Downs 1 operations for processing using existing facilities. In addition to the mining development, the Proposal includes the realignment of approximately six kilometres (km) of the... More
    Closed 18 December 2023
  • Earl Grey Lithium Project, Life of Mine Proposal

    The revised proposal is to develop a pegmatite-hosted lithium deposit at the abandoned Mt Holland Mine Site, in a Development Envelope of 3,996 ha. The Proposal involves new clearing of up to 1,885 ha of native vegetation, and use of existing cleared/disturbed land, infrastructure including a mine pit, waste rock landforms, tailings storage facility, processing plant, airstrip, accommodation village, water storage facilities, power generation infrastructure and associated infrastructure. ... More
    Closed 14 December 2023
  • Winu Project

    Rio Tinto Winu Pty Limited (the Proponent) proposes to develop the Winu Project (the Proposal). The Proposal is a new copper-gold mine located approximately 300 km south of Broome and 320 km east of Port Hedland in the northern Pilbara region of Western Australia within both the Nyangumarta people’s and the Martu people’s Native Title Determination Areas. The Proposal conceptual footprint will require the clearing of up to 4,868 ha of native vegetation within a proposed... More
    Closed 13 December 2023
  • Subdivision of Lot 123 Mortimer Road Casuarina - Additional Information

    Lot 123 Mortimer Road Casuarina (Lot 123) is 45 hectares (ha) in size, and is proposed to be subdivided into two lots; one conservation lot of 7.9 hectares (ha) and a balance lot for residential development. Lot 123 contains excellent quality Banksia woodland vegetation, threatened fauna habitat, and a conservation category wetland. The Level of Assessment was set at Referral Information with Additional Information (2 weeks public review). The additional information published... More
    Closed 4 December 2023
  • Metropolitan Region Scheme Amendment 1344/57 Maida Vale Urban Precinct - Environmental Review

    The Western Australian Planning Commission (WAPC) intends to amend the Metropolitan Region Scheme (MRS) for land in the City of Kalamunda and is seeking public comment. The amendment proposes to rezone approximately 177.53 ha of land in Maida Vale from the ‘Rural’ zone to the ‘Urban Deferred’ zone in the MRS. The proposed ‘Urban Deferred’ zone will facilitate future residential and areas of public open space, following the lifting of ‘Urban Deferment’, a local... More
    Closed 28 November 2023
  • Tredrea Workers accommodation Village

    Catalano Green Energy Pty Ltd (the proponent) is proposing to construct a portable 101 single person workers accommodation unit on Lot 28 Tredrea Place, Myalup, within the Shire of Harvey. The Development Envelope (approximately 40 hectares) includes Tuart Woodlands and Forest of the Swan Coastal Plain and Black cockatoo foraging habitat. The proposal includes groundwater abstraction, onsite PVC solar and battery storage for electricity generation and a wastewater... More
    Closed 19 November 2023
  • Sandy Ridge Facility – Alignment of Gate Waste Acceptance Tonnage - Public Environmental Review

    Tellus Holdings Ltd are proposing to increase the tonnage of waste accepted at the Sandy Ridge Facility from the current approved (Ministerial Statement 1078) 100,000 tonnes per annum to up to 280,000 tonnes per annum for permanent isolation in the Site’s waste disposal cells.  The Proposal will occur within the existing and approved development envelope as outlined in Ministerial Statement 1078 The Level of Assessment was set at Public Environmental Review (6 week... More
    Closed 15 November 2023
  • Clarke Road Large Format Retail and Hardware Development

    Colchester Pty Ltd propose to construct a large format hardware and retail development at Lot 100 and 256 Clarke Road within the Station Road commercial precinct located 900 metres south of the Margaret River town site. The proposal includes buildings internal roads, hardstand areas and landscaping. The proposal site is 2.86 hectares (ha) and is bounded by existing commercial business to the north and south, the South Regional TAFE Margaret River Campus to the east and remnant vegetation... More
    Closed 14 November 2023
  • Brockman Syncline Proposal - Public Environmental Review

    Hamersley Iron Pty Limited is proposing to develop additional above and below ground water table mine pits to sustain operations at three existing operations: Nammuldi-Silvergrass Brockman 2 Brockman 4 The proposal is located approximately 60 km west-north west of Tom Price, in the Pilbara region of Western Australia. An Environmental Review Document (ERD) has been prepared by Rio Tinto Iron Ore on behalf of Hamersley Iron Pty... More
    Closed 13 November 2023
  • Broome Regional Resource Recovery Park – Landfill Development

    The Shire of Broome propose to develop a Class III landfill, leachate management system and asbestos monocell at the Regional Resource Recovery Park (RRRP). The RRRP is located at Lot 550 on the Broome-Cape Leveque Rd, 12km northeast of the Broome town centre More
    Closed 8 November 2023
  • Western Extension to the Keysbrook Mineral Sands Project

    Keysbrook Leucoxene Pty Ltd is proposing to expand its current mining operation for the Keysbrook Mineral Sands Project, which operates under Ministerial Statement Numbers 810 and 1089, to include an additional 511.64 hectares of mining area located immediately west of the current operations. More
    Closed 25 October 2023
  • Rockingham Industry Zone Undeveloped Land Derived Proposal Application

    DevelopmentWA propose to develop undeveloped land in the Rockingham Industrial Zone, located approximately 40 kilometres south of Perth, in the City of Rockingham and City of Kwinana. The proposal is a derived proposal, authorised by the Rockingham Industrial Zone Strategic Environmental Assessment, Ministerial Statement 863 (EPA report number 1390). The proposal would consist of the development and subdivision of undeveloped land in the Rockingham Industrial Zone into 13 superlots,... More
    Closed 18 October 2023
  • Port Hedland Green Steel Project - Stage 1

    Port Hedland Green Steel Pty Ltd proposes to develop a large-scale downstream iron ore processing facility known as the Port Hedland Green Steel Project – Stage 1 . The proposal is located in the Boodarie Strategic Industrial Area (BSIA) approximately 10 km south-west of Port Hedland in the Pilbara region. The proposal will consist of a pellet plant and a hot briquette iron (HBI) plant, consuming approximately 3 - 3.5 million tonnes per annum (Mtpa) of iron ore. ... More
    Closed 15 October 2023
  • BP Kwinana Renewable Fuels Project

    The Proposal is for the construction and operation of a Renewable fuels processing facility that produces renewable diesel and sustainable aviation fuel from vegetable oils, animal fats and other biowaste products. The biorefinery will reuse the existing processing infrastructure formerly used for hydrocarbon refining (such as hydrofiner units, storage tanks, pipelines and utilities such as the flare and wastewater treatment plant) combined with some additional new infrastructure such... More
    Closed 19 September 2023
  • Ashburton Salt Project - Public Environmental Review

    K plus S Salt Australia Pty Ltd is proposing to develop and operate a green field solar salt Project (Ashburton Salt Project) on the Western Australian coast, approximately 40 km south-west of the township of Onslow. An Environmental Review Document (ERD) has been prepared by K plus S Salt Australia Pty Ltd in accordance with Environmental Protection Authority procedures and is released for public review. The ERD describes the proposal, the likely environmental impacts, and... More
    Closed 4 September 2023
685 results. Page 1 of 23