Find activities

770 results

  • Northern Extension to Yalyalup Mineral Sands Project - Additional Information

    Doral Mineral Sands Pty Ltd (Doral) is proposing to expand its current mining operation for the Yalyalup Mineral Sands Project which operates under Ministerial Statement 1168, to include an additional 844.92 hectares of mining adjacent to the existing operation. An Environmental Review Document (ERD) has been prepared by Doral in accordance with Environmental Protection Authority procedures and is released for public review. The ERD describes the proposal, examines the likely... More
    Opened 12 September 2025
  • Browse Carbon Capture and Storage Project

    Proposal by Woodside Energy Ltd to develop infrastructure to transport, inject and permanently sequester up to 14,200 tonnes of carbon dioxide (CO 2 ) per day into the Calliance Storage Formation at an expected annual average injection rate of 3-4 million tonnes per annum. Calliance is an underground, rock formation located offshore, 4 km below the seabed and about 425 km north of Broome. The CO 2 would originate from the proposed Browse to North West Shelf Project which... More
    Opened 17 September 2025
  • Perth Entertainment and Sporting Precinct

    The proposal is to construct and operate a new multi-use entertainment and sporting precinct at Burswood Park. The precinct will include : a new outdoor amphitheatre for live music and other events ; a multi-use track for motor racing ( including a one 3-day Supercars event per year) , cycling and community sport; a multi-use event building,... More
    Opened 2 October 2025
  • METRONET on Swan Ferry Service Expansion: Perth to Applecross

    The Public Transport Authority of Western Australia (PTA) propose s to expand the Swan River Ferry Network by constructing new ferry infrastructure and services at Matilda Bay and Applecross, and upgrad es to existing infrastructure at Elizabeth Quay . In addition to a new jetty and terminal, construction of the Matilda Bay facility will also include onshore electric charging infrastructure for the ferries, and modifi cation of the existing road layout... More
    Opened 6 October 2025
  • Wind Farm in Scott River

    The proposal is for the development of an onshore wind farm and involve s the construction and operation of up to 20 wind turbines, generating up to 100 MW . A ssociated infrastructure includ es meteorological masts and communication towers, operation and maintenance building, substation and transmission infrastructure and other supporting infrastructure. The proposal is located approximately 15 km northeast of the town of Augusta, in the ... More
    Opened 9 October 2025
  • Ministers North Derived Proposal

    The proposal is for iron ore mining operations at Ministers North, located approximately 85 km north-west of the Town of Newman. The proposal is located approximately 15 km south-east of BHP’s existing Yandi Mining Operations (Yandi). The proposal is a derived proposal for mining operations at Ministers North authorised by the Pilbara Expansion Strategic Proposal, Ministerial Statement 1105. The proposal includes: Above water table mining in open... More
    Opened 31 October 2025
  • Marri Wind Farm

    The proposal is for the development of an onshore wind farm and involves the construction and operation of up to 82 wind turbines, generating up to 550 megawatts (MW). Associated infrastructure includes temporary worker accommodation, a battery energy storage system (BESS), electrical cabling, transmission infrastructure, substation and other supporting infrastructure. The proposal is located approximately 20 km south of Dandaragan, Western Australia. The wind farm substation... More
    Opened 11 November 2025
  • Kalgoorlie Regional Renewable Energy Project

    The proposal is for the construction and operation of a renewable wind and solar generation hub to power Northern Star’s Kalgoorlie Consolidated Gold Mines (KCGM) Operations located approximately 10 kilometres (km) northeast of Kalgoorlie-Boulder on mining tenure held by Northern Star. The Proposal comprises the construction and operation of up to 32 turbines and a solar farm of a combined production capacity of 366-megawatt, a 300-megawatt hour battery energy storage system... More
    Opened 21 November 2025
  • Katanning Gold Project

    The Proposal is to construct and operate an open cut gold mine approximately 275 km southeast of Perth and 37 km northeast of Katanning, WA. The total disturbance proposed is up to 68.78 hectares (ha), which includes the disturbance of 58.39 ha of native vegetation over a 10-year life of mine. The annual total pit dewatering volume is estimated to be 0.4 gigalitres per year (GL/yr) with a maximum of 0.5 GL/yr. More
    Opened 25 November 2025
  • Lots 802 and part Lot 803 Erindale Road, Hamersley - Additional Information

    Digital 4 Pty Ltd is proposing the construction of residential housing and associated civil infrastructure, and the establishment of a conservation area. The proposal is located approximately 12 km north of Perth CBD, in the suburb of Hamersley. The additional information package has been prepared by Digital 4 Pty Ltd in accordance with Environmental Protection Authority procedures and is released for public review. The Level of Assessment was set at Referral... More
    Opened 3 December 2025
  • Tathra Wind Farm

    The proposal is for the development of an onshore renewable energy facility and involves the construction and operation of up to 140 wind turbines, generating up to 1,0 00 MW, up to 5 00 MW of solar power generation, battery energy storage system with capacity of up to 500 MW, and associated supporting infrastructure. The proposal is located approximately 15 km east of the town of Eneabba in the Mid West region of Western... More
    Opened 3 December 2025
  • Northern Terminal to Neerabup Terminal 330kV Transmission Line - Additional Information

    Western Power is proposing to construct a new 330kV dual circuit transmission line between Northern Terminal in Malaga and Neerabup Terminal in Pinjar, a length of approximately 29 km. The Proposal also includes the expansion of the two existing Western Power substations, Northern Terminal and Neerabup Terminal. The purpose of the Proposal is to reinforce the North Region transmission network to remove constraints on existing connected generation, provide additional capacity to... More
    Opened 8 December 2025
  • Yathroo Wind Farm

    The proposal is for the development of an onshore wind farm and involves the construction and operation of up to 65 wind turbines, generating up to 5 0 0 m egawatts (MW). Associated infrastructure includes a battery energy storage system (BESS), electrical cabling, substation , transmission infrastructure , and other supporting and temporary infrastructure. The Proposal is located on freehold agricultural land ... More
    Opened 13 January 2026
  • Orebody 32 Below Water Table Creek Discharge

    BHP proposes to construct and operate a creek discharge at Homestead Creek to manage up to 60 megalitres per day (up to 16.2 gigalitres per annum) of surplus water from the existing Orebody 32 Below Water Table (BWT) mining operations, located approximately 3.6 kilometres northeast of Newman. The existing Orebody 32 BWT mine includes below water table mining and the construction of a surplus water pipeline to Ophthalmia Dam. The proposal is a derived proposal authorised by the... More
    Opened 14 January 2026
  • Kalgoorlie Thermal Power Project

    The proposal is for the construction and operation of a 140 megawatt (MW) thermal power station and associated supporting infrastructure located directly east of Kalgoorlie-Boulder in the Goldfields region of Western Australia. The proposed power station will supply electricity to Kalgoorlie Consolidated Gold Mines (KCGM) and connect to the South West Interconnected System (SWIS). The power station will be capable of operating using natural gas, distillate and future... More
    Opened 16 January 2026
  • Sand and Limestone Extraction Project, Nowergup

    Urban Resources Pty Ltd proposes to conduct sand and limestone extraction at Lot 107 Godel Road, Nowergup. The site is located approximately 2.6 kilometres east of Alkimos in the City of Wanneroo and is expected to be operational for 10 years. Site infrastructure includes a mobile crushing and screening plant. The proposal includes a total disturbance of 13.94 hectares of native vegetation . More
    Opened 10 February 2026
  • Wyloo North Iron Ore Mine

    Fortescue Ltd (Fortescue) proposes to develop the Wyloo North Iron Ore Mine in the Pilbara region of Western Australia, approximately 110 kilometres (km) west of Tom Price in the Hamersley Range. The Proposal involves the construction and operation of an iron ore mine using conventional open-cut methods, including mining both above and below the groundwater table. To support mining activities, the Proposal includes the development of mine pits, waste rock landforms, ore and soil... More
    Opened 17 February 2026
  • Sanjiv Ridge Pit Expansion, Stage 1 Below Groundwater Table Mining

    Sanjiv Ridge is an Iron ore mine located approximately 33km south of Marble Bar in the Pilbara region of Western Australia. The proposal involves expansion of the existing Stage 1 approval to allow mining below the water table at Mine Pits (Sparrow, Shark Gully, Runway North and Runway South), development of additional pits (Pedmore and CD15), an increase to groundwater abstraction to support operations, management of surplus water and potentially acid forming material, and... More
    Opened 24 February 2026
  • Bonney Downs Wind Farm

    Pilbara Energy (Generation) Pty Ltd proposes to construct and operate the Bonney Downs Wind Farm to connect with the Fortescue Integrated Power Network The proposal is located approximately 9 km southwest of Nullagine (at the northern extent of the Proposal) in the Shire of East Pilbara and Palyku and Nyiyaparli Native Title Determination Areas. The proposal comprises the installation of wind turbines, substations, 33 kV reticulation to collect power from wind turbines, associated... More
    Opened 27 February 2026
  • Eureka 3D Marine Seismic Survey

    Pilot Energy Limited proposes to undertake marine seismic surveying 7 kilometres off the mid-west coast of Western Australia, south of Dongara. The survey aims to acquire three-dimensional seismic data to improve understanding of subsurface geology and assess potential natural gas resources. The proposal involves a purpose-built survey vessel traversing the survey area, generating seismic sound using controlled releases of compressed air. The vessels will tow 6 cables approximately... More
    Opened 5 March 2026
770 results. Page 26 of 26