Bonney Downs Wind Farm - Public Environmental Review
Overview
Pilbara Energy (Generation) Pty Ltd, a wholly owned subsidiary of Fortescue Limited (Fortescue), is proposing to develop the Bonney Downs Wind Farm, comprising a wind farm and associated supporting infrastructure. The proposal is located approximately 9 km southwest of Nullagine.
An Environmental Review Document (ERD) has been prepared by Pilbara Energy (Generation) Pty Ltd in accordance with Environmental Protection Authority procedures and is released for public review.
The ERD describes the proposal, examines the likely environmental effects and the proposed environmental management procedures associated with the proposed development.
The ERD is available for download from Bonney Downs Wind Farm | EPA Western Australia under 3. Assessment > Environmental Review.
Hard copies of the document may be purchased for $10 (including postage and packaging) from:
Pilbara Energy (Generation) Pty Ltd
256 St Georges Terrace, Perth WA 6000
(08) 6218 8888
Copies of the document will be available for examination at:
- Nullagine Public Library
- Newman Public Library
- State Library of Western Australia.
Public submissions are to be received by the EPA by 9 December 2026.
Submissions should be made through this portal.
Alternatively submissions can be
Posted to:
Chair
Environmental Protection Authority
Locked Bag 10
Joondalup DC WA 6919.
Delivered to:
Environmental Protection Authority
Prime House
8 Davidson Terrace
Joondalup WA 6027.
If you have any questions on how to make a submission, please contact Green Energy of the Department of Water and Environmental Regulation on 6364 7000.
Give Us Your Views
Areas
- All of Western Australia
Audiences
- Public
Interests
- Public Environmental Review
Share
Share on Twitter Share on Facebook