Belisama Gas Project
Overview
The proposal involves the construction and operation of a Central Processing Facility (CPF) and associated infrastructure, including a buried central flowline and gas export pipeline in the Mid-West region of Western Australia (WA). The proposed location is approximately 350 kilometres (km) north of Perth and 25 km south‑west of Mingenew.
Gas produced from nearby developments, which are separate to this proposal, will be transported via a buried central flowline for processing at the CPF. Processed gas will be exported via a gas export pipeline from the CPF to the Dampier Bunbury Natural Gas Pipeline (DBNGP).
The Development Envelope is 1,326.9 hectares (ha), with an estimated Disturbance Footprint of 291.5 ha, including approximately 5.7 ha of remnant native vegetation.
Why your views matter
At this initial stage of the EIA process, comment is simply sought on whether or not the EPA should assess a proposal and, if so, what level of assessment is considered appropriate.
Give us your views
Areas
- All of Western Australia
Audiences
- Public
Interests
- Seven-day comment on referrals
Share
Share on Twitter Share on Facebook