Keralup Energy Hub

Overview

APA KPS Pty Ltd propose to construct thermal power generation facilities on Lot 9501 Keralup (City of Rockingham) with supporting infrastructure on Lot 9503 (Shire of Murray) located approximately 53 kilometres south of Perth. 

The proposal will include the construction and operation of a temporary 210 megawatt (MW) capacity gas-fuelled power supply, operated as an islanded power network for a potential future industrial client. A permanent 660 MW gas-fuelled power supply, including a battery energy storage system, will be constructed and be connected to the southwest interconnected system. 

The proposal has a disturbance footprint of 281 hectares (ha) within a 452.4 ha development envelope, including clearing of 251.1 ha of native vegetation.

Why your views matter

At this initial stage of the EIA process, comment is simply sought on whether or not the EPA should assess a proposal and, if so, what level of assessment is considered appropriate.

To receive updates about this proposal or scheme, you must subscribe to email notifications through the EPA's website. Email subscription is the only way you will be notified of updates.

What happens next

Following the seven day public comment period and consideration of any comments received, the EPA will decide whether or not this proposal requires environmental impact assessment and, if so, what level of assessment will be applied.

The EPA's decisions on level of assessment are published on the EPA's website.

To receive updates about this proposal or scheme, you must subscribe to email notifications through the EPA's website. Email subscription is the only way you will be notified of updates.

Closed 1 Nov 2026

Opened 26 Oct 2026