Mobile Concrete Batching Plant

Closed 5 Jul 2016

Opened 29 Jun 2016

Overview

Keppel Holdings proposes the development and operation of a mobile concrete batching plant at Lot 105 (No. 2) Clune Street, Bassendean. The proposal site is located within the Bassendean Industrial Area. The proposal includes the construction of buildings and associated car and truck parking.

This proposal was originally referred by the Shire of Bayswater in May 2016. Keppel Holdings subsequently provided a referral of the proposal in June 2016. Both of these referrals are provided for review as a part of this consultation.

Why your views matter

At this initial stage of the EIA process, comment is simply sought on whether or not the EPA should assess a proposal and, if so, what level of assessment is considered appropriate.

The following diagram shows the stage this referral is at:

Diagram showing where the seve-day public comment sits in the overall assessment process

What happens next

Following the seven day public comment period and consideration of any comments received, the EPA will decide whether or not this proposal requires environmental impact assessment and, if so, what level of assessment will be applied.

The Chairman's decisions on level of assessment are released each Monday on the EPA's website.

Areas

  • All of Western Australia

Audiences

  • Public

Interests

  • Seven-day comment on referrals