Twin Hills Wind Farm

Overview

The proposal is for the construction and operation of a renewable energy facility located 30km north-east of Eneabba, within the Shire of Three Springs.

The proposal involves the construction and operation of up to 93 wind turbines, a Battery Energy Storage System (BESS) (up to 500MW) and associated infrastructure. The proposal will connect to the South-West Interconnected System (SWIS) via an existing transmission line.

The location of the proposal is land substantially cleared for agricultural purposes, with patches of remnant vegetation.

The proposal would include a total disturbance of up to 543.6 hectares including 17.14 hectares of native vegetation clearing.

Why your views matter

At this initial stage of the EIA process, comment is simply sought on whether or not the EPA should assess a proposal and, if so, what level of assessment is considered appropriate.

To receive updates about this proposal or scheme, you must subscribe to email notifications through the EPA's website. Email subscription is the only way you will be notified of updates.

Closes 3 Aug 2026

Opened 27 Jul 2026