Eliwana Railway Project - Minor or Preliminary Works Application
Fortescue Metals Group Limited has requested consent under section 41A(3) of the Environmental Protection Act 1986 to undertake work it considers to be minor or preliminary in nature. The purpose of this work is to facilitate rapid implementation of the proposal if the railway proposal is approved, by allowing construction personnel, equipment and water requirements to be quickly and safely mobilised to the site. The works would include construction of the following: two rail... MoreOpened 18 April 2018 -
Eliwana Iron Ore Mine Project - Minor or Preliminary Works Application
Fortescue Metals Group Limited has requested consent under section 41A(3) of the Environmental Protection Act 1986 to undertake work it considers to be minor or preliminary in nature. The purpose of this work is to facilitate rapid implementation of the proposal if the mine proposal is approved, by allowing construction personnel, equipment and water requirements to be quickly and safely mobilised to the site. The works would include construction of the following: an... MoreOpened 18 April 2018 -
Beyondie Sulphate of Potash Project - Minor or Preliminary Works Application
Kalium Lakes Potash Pty Ltd has requested consent from the Environmental Protection Authority under section 41A(3) of the Environmental Protection Act 1986 to undertake work it considers to be minor or preliminary in nature. The purpose of the works is to upgrade existing infrastructure that was developed during the investigations phase of the project. The work includes the following: - Site access road upgrade. - Upgrade and expansion of the accommodation camp from 16 to... MoreOpened 11 April 2018 -
Albemarle Lithium Plant - Additional information
Albemarle Lithium Pty Ltd (Albemarle) is proposing to establish the Albemarle Kemerton Plant, a Lithium Hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area, approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonnes per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains, and produce up to 1,100,000 tpa of tailings.... MoreOpened 9 April 2018 -
Pardoo Irrigated Agriculture Project Stage 3 – Environmental Management Plan
The Proponent, Pardoo Beef Corporation Pty Ltd has prepared a draft Environmental Management Plan for public review. The purpose of this Plan is to describe the proposal, outline the key environmental factors and to describe how the impacts related to the implementation of the proposal could be managed. MoreOpened 14 March 2018 -
Pinky’s Beach Eco Retreat
The proposal is to develop Pinky’s Beach Eco-Retreat located adjacent to Pinkys Beach, on Rottnest Island. The Eco-Retreat is to be located west of the existing campground and directly adjacent to an existing Waste Water Treatment Plant (WWTP) to the east. The Proposal will involve the construction and operation of the following: · 83 small holiday canvas accommodation dwellings; · food and beverage “Beach Club” outlet with nearby shade structures; · ... MoreOpened 2 March 2018 -
Edna May Gold Project
Ramelius Resources Ltd propose to extend the life of the Edna May Gold Project operations by developing a new open pit immediately to the west of the existing operations. The project implementation would result in disturbance of up to 55.3 hectares of vegetation. The Edna May Gold Project is located approximately 1 km north-west of the township of Westonia and 312 km east of Perth. MoreOpened 27 February 2018 -
Medcalf Vanadium Project
Audalia Resources Limited (Audalia) is proposing to construct and operate a vanadium, titanium and iron ore mine approximately 100 kilometres (km) west of Norseman, Western Australia (WA). The Medcalf Project, located in the Bremer Range, Lake Johnston region of Western Australia, approximately 470 km east south-east of Perth. The proposal includes three separate open pits and requires up to 650 ha of native vegetation clearing. Mining will occur above groundwater. The proposal... MoreOpened 27 February 2018 -
Port of Broome Channel Optimisation Project
Kimberley Ports Authority (KPA) is seeking to improve accessibility to the Port of Broome, situated in West Roebuck Bay, approximately 5 kilometres south west of the township of Broome. Larger vessels entering the Port, such as cruise ships, have limited access windows due to the large tidal range (10m), presence of channel rock and high spots (shoals) in the access channel. In recognition of the access constraints and the growing tourism industry in Broome, the Department of Primary... MoreOpened 21 February 2018 -
Yanchep Rail Extension: Part 1 – Butler to Eglinton
The Public Transport Authority (PTA) proposes to extend the existing Joondalup railway line by 7.3 kilometres from Butler Station to the suburb of Eglinton in the City of Wanneroo. The proposal is to construct and operate the rail extension and includes two new intermodal (rail, bus, ‘park and ride’, ‘kiss and ride’, walk and cycle) transit stations at Alkimos and Eglinton. The PTA will operate train services between Perth and Eglinton Stations and bus services from the Alkimos and... MoreOpened 16 February 2018 -
Pardoo Irrigated Agriculture Project – Stage 3
Pardoo Beef Corporation Pty Ltd proposes to develop a centre-pivot irrigated feed crop production facility. Centre-pivot irrigation is a method of crop irrigation in which equipment rotates around a pivot and crops are watered with sprinklers. The proposal is approximately 100km east-northeast of Port Hedland and 365km south west of Broome. The proposal is for stage 3 and would include a total disturbance of 368 hectares development envelope. MoreOpened 14 February 2018 -
Learmonth Bundle Site – Environmental Scoping Document
Subsea 7 Australia Contracting Pty Ltd proposes to construct and operate an onshore pipeline bundle fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35 km south of the Exmouth townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The operation of the proposal includes the launch of constructed pipeline bundles from Heron Point in the Exmouth Gulf, which then... MoreOpened 14 February 2018 -
Johns Creek Boat Harbour Maintenance Dredging
Johns Creek Boat Harbour is a small facility located at Point Samson, 40 km east of Karratha. Dredging of the Boat Harbour and Entrance Channel is required to restore navigable depths, and is planned for autumn 2018. Maintenance dredging is proposed to occur within the Boat Harbour and Entrance Channel, with disposal to a sandbank about 1 km south of the Boat Harbour (Western Disposal area). MoreOpened 13 February 2018 -
Rosslyn Hill Mining Paroo Station Lead Mine Hydrometallurgical Facility
Rosslyn Hill Mining Pty Ltd is proposing to expand their operations at Paroo Station to install a hydrometallurgical facility to convert lead carbonate concentrate to lead metal (ingots). The proposal is located 30 km west of Wiluna (Shire of Wiluna). The proposal includes an additional clearing of approximately 400 hectares, and the exportation of the product through the Port of Fremantle. MoreOpened 5 February 2018 -
Yogi Magnetite Project
FI Joint Venture Pty Ltd is proposing to construct and operate a magnetite iron ore project, with mining, processing and associated infrastructure. The proposed mine is located approximately 225 kilometres (km) east-northeast of Geraldton and 15 km northeast of Yalgoo within the Shire of Yalgoo. The proposal includes a magnetite slurry pipeline and a water pipeline to Geraldton Port and a gas supply pipeline from the Dampier to Bunbury Natural Gas Pipeline network. Mining of... MoreOpened 1 February 2018 -
East Rockingham Waste to Energy Facility Revised Proposal - Public Environmental Review
New Energy Corporation is proposing to construct a state-of-the-art Waste to Energy Facility to process up to 330,000 tpa of Municipal and Commercial and Industrial Waste that is currently directed to landfi ll and produce 28.2 MW of electricity and approximately 60,000 tpa of road base materials. A Public Environmental Review (PER) has been prepared by New Energy Corporation in accordance with Environmental Protection Authority procedures and is released for public review.... MoreOpened 22 January 2018 -
Busselton Eastern Link Project
City of Busselton proposes to construct a new route into Busselton. The proposal involves the development of a new two-lane road and bridge linking Causeway Road to Cammilleri Street, including a new bridge over the Vasse river. Disturbance associated with the proposal would include construction on the banks of the Vasse River and removal of 0.56 hectares of native vegetation. MoreOpened 15 January 2018 -
Lake Wells Potash Project
Australian Potash Limited proposes to abstract brine resources to produce a sulfate of potash (SOP) product at the Lake Wells Potash Project. The proposal area is located on and adjacent to the Lake Wells Playa Lake system (salt lake terrain), approximately 160km north-northeast of Laverton in Western Australia. The proposal would include construction of an SOP processing plant, brine abstraction bores, evaporation ponds, raw water bore field, accommodation village and other associated... MoreOpened 8 January 2018 -
Tompkins Park Wave Park Project
URBNSURF (Perth) Pty Ltd proposes to construct and operate a surf sports, recreation and leisure facility at the western end of Tompkins Park in Alfred Cove. The facility will feature an open water surfing lagoon which generates consistent surfing waves of variable height in quick succession. The proposal is located adjacent to the Swan River and the A-Class Alfred Cove Nature Reserve. Currently majority of the site covered in turf from existing playing fields and bowling greens of the... MoreOpened 4 January 2018 -
Two Rocks Marina Redevelopment
The proposal is to undertake a number of redevelopment works to upgrade the existing Two Rocks Marina facilities to address ageing infrastructure, improve safety and provide a foundation for future redevelopment opportunities. This includes the construction of: a reclamation area; breakwater turning and laydown area; and new floating boat pens. MoreOpened 21 December 2017 -
State Barrier Fence Esperance Extension - Environmental Review
The Department of Primary Industries and Regional Development is proposing to extend the existing state barrier fence from its current termination point 25 kilometres east of Ravensthorpe, north to Salmon Gums and ending east of Esperance near Cape Arid National Park in Western Australia. An Environmental Review Document (ERD) has been prepared by the Department of Primary Industries and Regional Development in accordance with Environmental Protection Authority procedures and is released... MoreOpened 18 December 2017 -
Asian Renewable Energy Hub
NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,200 turbines) and solar panels distributed across a 644,600 ha development envelope,... MoreOpened 30 November 2017 -
Earl Grey Lithium Project - Change to Proposal
Kidman Resources and SQM (KR&SQM) has requested a Change to Proposal through section 43A of the EP Act. KR&SQM proposes the following changes to the Earl Grey Lithium Project: - Modification of waste dump 3 to avoid an active mallee fowl mound; - Increase of cell 2 of the tailings storage facility to increase capacity; and - Incorporation of the existing road network that will be used as part of the proposal into the proposal description. MoreOpened 30 November 2017 -
AME Marine Support Base Dredge and Reclamation
AME is proposing to expand the existing facility in Henderson and further develop the waterfront infrastructure by dredging within an area of the Northern Harbour, Jervoise Bay. The proposal is immediately adjacent to the AME site (49 Clarence Beach Road, Henderson) and proposes to utilise the dredge sediments to create a land-backed wharf. MoreOpened 27 November 2017 -
Albemarle Kemerton Plant
Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of... MoreOpened 20 November 2017 -
Yalyalup Mineral Sands Project
Doral Mineral Sands Pty Ltd proposes to develop and operate a mineral sands deposit approximately 11 kilometres southeast of Busselton. The proposal includes the development of mine pits and associated infrastructure, wet concentration processing plant, solar evaporation ponds, groundwater abstraction and water management infrastructure and process water pond. The proposal would include a total disturbance of 373 hectares within a development envelope of 894 hectares. The majority of... MoreOpened 13 November 2017 -
Onslow Marine Support Base Stage 2 Capital Dredging - Environmental Management Plan
Onslow Marine Support Base Pty Ltd is proposing to modify and extend the Beadon Creek harbour approach channel, turning basin and berth pocket as part of Stage 2 of the Onslow Marine Support Base (OMSB) proposal. The proposed capital dredging will enable offshore supply vessels to access the newly constructed OMSB land-backed wharf facility (Stage 1) within the Beadon Creek Maritime Facility. 930,000 cubic metres of dredge material will be disposed of... MoreOpened 13 November 2017 -
Plantrite Nursery Expanion Lot 88 Bingham Road Bullsbrook
Plantrite Nursery has applied to the City of Swan for retrospective planning approval for the expansion of its existing 5 hectare (ha) native plant nursery on Lot 88 Bingham Road Bullsbrook (Lot 88). This expansion is proposed to be completed over two stages totalling 10.67 ha; Stage 1 covering 4.76 ha and Stage 2 covering 5.91 ha. However, approximately 2.5 ha of Stage 1 has already been constructed. The expansion will also require a new groundwater abstraction licence. Stage 2 is only... MoreOpened 9 November 2017 -
Learmonth Bundle Site
Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The proposal consists of an onshore pipeline bundle fabrication site and associated infrastructure, two bundle tracks (approximately 10km in length) along which... MoreOpened 6 November 2017 -
Beyondie Sulphate of Potash Project
Kalium Lakes Potash Pty Ltd is seeking to develop a sub-surface brine deposit to produce approximately 150 kilotonne per annum of Sulphate of Potash product and by-products. The process will involve evaporation and processing operations at the Beyondie, 10-Mile and Sunshine Lakes area. The Project is located approximately 160 kilometres south east of Newman, and 75 km east of the Kumarina Roadhouse, in the eastern Pilbara region of Western Australia. The proposal includes the... MoreOpened 6 November 2017