Eramurra Industrial Salt Project
Leichhardt Industrials Pty Ltd (Leichhardt) is seeking to develop a salt production and export operation in the Cape Preston East area, approximately 55 kilometres (km) westsouth-west of Karratha in Western Australia (WA). The proposal will utilise seawater and evaporation to produce concentrated salt products for export. The proposal includes the development of a series of concentrator and crystalliser ponds, processing plant, product pipeline and offshore export... MoreClosed 15 January 2019 -
Scarborough Project Nearshore Component
The Proposal would include the following activities: • shore crossing site preparation including installation of temporary facilities along the shoreline at the Pluto LNG Facility to facilitate the installation of the trunkline in shallower depths • preparation works associated with the installation of the trunkline including dredging and associated spoil disposal at existing spoil grounds • trunkline... MoreClosed 15 January 2019 -
Cape Lambert Port A Marine Structures Refurbishment Project
The Proposal is to undertake essential maintenance works on the Cape Lambert Port A (CLA) wharf facility and associated jetty. The Proposal consists of two components, the CLA Dolphin Life Extension Project and the CLA Jetty Strengthening Project, collectively referred to as CLA Marine Structures Refurbishment Project (the Proposal). The CLA dolphins were constructed between 1972 and 2002, with recent inspections indicating that the current dolphins are near end of life... MoreClosed 15 January 2019 -
Non-lethal trial of SMART drumlines
The proposal is to undertake a trial of the SMART drumlines as a non-lethal shark hazard mitigation tool in Western Australian conditions. In doing so, it is proposed to catch, tag, relocate and release white sharks. The proposal is located in waters offshore from Gracetown (offshore from Shire of Augusta Margaret River), in the Ngari Capes Marine Park. The duration of the trial will be for 15 months. Where possible, the proposed WA SMART drumline project has been aligned with... MoreClosed 9 January 2019 -
Asian Renewable Energy Hub – Change to Proposal
NW Interconnected Power Pty Ltd has requested a Change to Proposal through section 43A of the Environmental Protection Act 1987. NW Interconnected Power Pty Ltd proposes the following changes to the Asian Renewable Energy Hub Proposal: An increase in native vegetation clearing from 7,370 hectares (ha) at referral to 11, 962 ha (i.e. an increase in native vegetation clearing of 4, 592 ha). This equates to an increase of 0.7 per cent within the development envelope. ... MoreClosed 2 January 2019 -
Public Environmental Review - Mesa A Hub Revised Proposal
Robe River Mining Co Pty Ltd (a wholly owned subsidiary of the Rio Tinto Group) is seeking to extend the existing Mesa A / Warramboo Iron Ore Project by extending the existing mining operation and developing four new nearby deposits. The proposal is 43 kilometres west of Pannawonica in the Pilbara Region. The proposal will require an additional 3000 hectares of clearing of native vegetation, with some below water table mining. The proposal will also require a water supply and surplus water... MoreClosed 24 December 2018 -
Gabanintha Vanadium Project
Technology Metals Australia are looking to develop the Gabanintha Vanadium Project. The Gabanintha Vanadium Project is located within WA’s Mid-West region, approximately 615 km north-east of Perth and 40 km south-east of Meekatharra, adjacent to the Meekatharra-Sandstone Road. The proposal includes development of multiple vanadium deposits (Far North, North, and Central) via open pit mining. Supporting infrastructure for the Project includes waste rock... MoreClosed 20 December 2018 -
Dampier Palms - Sand Renourishment Trial
City of Karratha are proposing a trial which involves a total of 7,000m 3 of sand renourishment at Dampier Palms Beach using clean coarse sand from the Extraction Area, south of Hampton Oval. Placement of the sand will occur on the beachface, mostly between mean sea level and highest astronomical tide, at two sites either side of a minor rock control at Dampier Palms Beach. The renourishment is proposed to occur in two stages, with: An initial trial renourishment of... MoreClosed 4 December 2018 -
Pivot Irrigation System Research
The proponent, Kelliher Bros. plan to expand their grass-fed beef production business from 6 weeks a year to year-round grazing. To achieve this, the proponent would like to trial the installation of a single 40 ha centre pivot irrigator for irrigating pasture within an area of Lot 209 Paterson Road, Ravenswood (88 ha). The proposal occurs within the Environmental Protection Peel Inlet - Harvey Estuary Policy 1992 policy area. MoreClosed 27 November 2018 -
Munglinup Graphite Project
The Munglinup Graphite Project is located in the South Coast region of Western Australia, approximately 105km west of Esperance, 85km east of Ravensthorpe and 4km north on Munglinup. MRC Graphite Pty Ltd propose to extract graphite from up to six open pits. The proposal will also include a processing plant, tailings storage facility, waste rock landforms, and associated infrastructure. The proposal would include a total disturbance of 350 hectares. MoreClosed 27 November 2018 -
Pilbara Regional Waste Management Facility
The Shire of Ashburton is proposing the development of a new regional waste management facility located on undeveloped land at 150 Onslow Road, Talandji, approximately 36 km south of Onslow. The Pilbara Waste Management Facility will provide a range of waste management services including sustainable initiatives such as material reuse, recycling and recovery as well as treatment and disposal. The facility will include: Class IV Landfill; Bulk... MoreClosed 27 November 2018 -
Pluto North West Shelf Interconnector Pipeline
The Proposal is to construct and operate the Pluto to Northwest Shelf Interconnector, a 3.3 km long, steel buried natural gas pipeline, connecting the Pluto Interconnector Compressor Station to the Karratha Gas Plant which is operated by Woodside on behalf of the North West Shelf Project participants, located on the Burrup Peninsula in the North of Western Australia. The proposal will require the clearing of an estimated 10.69 ha.3.26 ha within the Karratha Gas Plant Lease and Buffer... MoreClosed 27 November 2018 -
Proposed Browse to North West Shelf Development
Woodside Energy Ltd has provided a combined document that relates to both its Commonwealth referral (Environment Protection and Biodiversity Act 1999) and State referral (Environmental Protection Act 1986). The component within State Waters includes drilling and completion, installation, commissioning, operation, well repair and workover and decommissioning of subsea wells and associated infrastructure located in Western Australian State waters, to extract hydrocarbons from the... MoreClosed 27 November 2018 -
North West Shelf Project Extension
Ongoing operation of the North West Shelf Project to enable the long-term processing of third party gas and fluids and North West Shelf Joint Venture field resources through the North West Shelf Project facilities until around 2070. MoreClosed 27 November 2018 -
Downstream Processing Chemical Production Facility
Wesfarmers Chemicals, Energy & Fertilisers Limited proposes to construct and operate a methanol plant with a production capacity of approximately 5,000 tonnes per day (tpd) on Site E within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. The proposal is adjacent to the Murujuga National Park. The proposal would result in the disturbance of approximately 75 hectares within Site E. MoreClosed 20 November 2018 -
Greater Paraburdoo Iron Ore Hub Proposal
Hamersley Iron Pty Limited (the proponent) propose to develop the Greater Paraburdoo Iron Ore Hub. The proposal is an expansion of the existing operations at Paraburdoo and Eastern Range which is not subject to a Ministerial Statement issued under Part IV of the Environmental Protection Act 1986 (EP Act). The proposal area is located approximately six kilometres south of the town of Paraburdoo in the Pilbara region of Western Australia. Existing operations at Paraburdoo and... MoreClosed 20 November 2018 -
Perdaman Urea Project
Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. MoreClosed 20 November 2018 -
St Ives Gold Mine – Beyond 2018 Project - Public Environmental Review
The St Ives Gold Mining Company Pty Limited proposes to expand its existing open-cut and underground gold mining developments with 2,061 hectares (ha) of disturbance. The proposal is located on Lake Lefroy approximately 20 kilometres south east of Kambalda (Shire of Coolgardie). The revised proposal, Beyond 2018 Project, will facilitate the continuation of mining operations at Lake Lefroy and the wider St Ives mine site. The project boundary encompasses approximately... MoreClosed 14 November 2018 -
Eliwana Iron Ore Mine - Public Environmental Review
Fortescue Metals Group Ltd is proposing to construct and operate the Eliwana Iron Ore Mine, a new mine located approximately 90 kilometres west-north-west of Tom Price in the Pilbara Region of Western Australia. An Environmental Review Document (ERD) has been prepared by Fortescue Metals Group Ltd in accordance with Environmental Protection Authority procedures and is released for public review. The ERD describes the proposal, examines the likely environmental effects and the proposed... MoreClosed 29 October 2018 -
Yangibana Rare Earths Project - Public Environmental Review
Hastings Technology Metals Limited proposes to extract and process Rare Earth Element ore from four mining pits located approximately 270 kilometres east-north-east of Carnarvon in the Shire of Upper Gascoyne. The proposal would include clearing of up to 1,000 hectares within a development envelope of 13,373 hectares and water abstraction of up to 2.5 gigalitres per year. An Environmental Review Document (ERD) has been prepared by Hastings Technology Metals Limited in... MoreClosed 28 October 2018 -
High Street Upgrade
Main Roads WA is proposing to conduct works to upgrade approximately 1.5 kilometre (km) of High Street in the City of Fremantle, Western Australia. The upgrade from Stirling Highway to Carrington Street to a four lane dual carriageway is aimed at improving road safety. The works would require a total disturbance of approximately 20.1 hectares (ha), including 1.8 ha of the Fremantle Public Golf Course, Royal Fremantle Golf Club (Class A reserve) and 0.1 ha of the Fremantle... MoreClosed 25 October 2018 -
Albany Artificial Surf Reef
The City of Albany (CoA) proposes to construct an artificial surfing reef (ASR) at Middleton Beach, southern Western Australia. The proposed ASR will be built at the southern end of the beach with the aim of enhancing the recreational surfing conditions for local residents and tourists. The ASR will be designed to target beginner-intermediate surfers. MoreClosed 23 October 2018 -
West Angelas Iron Ore Project – Environmental Review Document
Robe River Mining Co. Pty. Ltd. proposes to develop the West Angelas C, D and G iron ore deposits to sustain production at the existing West Angelas iron ore operations. The proposal is located approximately 130 km northwest of Newman. Mining of the C, D and G iron ore deposits will involve the additional clearing of up to 4,310 ha of native vegetation within a mine development envelope of 26,400 ha. A Environmental Review Document (ERD) has been prepared by Robe... MoreClosed 25 September 2018 -
Eliwana Railway Project – Environmental Review Document
Fortescue Metals Group Ltd (Fortescue) is proposing to construct and operate the Eliwana Railway to transport bulk iron ore from its proposed Eliwana Iron Ore Mine to its port facilities in Port Hedland. The Eliwana Railway links the Eliwana Iron Ore Mine to Fortescue’s existing heavy haulage rail network. An Environmental Review Document (ERD) has been prepared by Fortescue Metals Group Ltd in accordance with Environmental Protection Authority procedures and is released... MoreClosed 25 September 2018 -
Yanchep Rail Extension: Part 2 – Eglinton to Yanchep
The Public Transport Authority (PTA) proposes to construct and operate an extension of the existing Joondalup railway line from a point north of the proposed future Eglinton Station. The proposal will extend the Joondalup railway line through to Yanchep in the City of Wanneroo and includes a new intermodal transit station within the Yanchep City Centre area. The development envelope is up to 73 hectares (ha) and the proposal will result in potential impacts to native vegetation that... MoreClosed 10 September 2018 -
Armadale Road to North Lake Road Bridge
Main Roads Western Australian (Main Roads) are proposing to upgrade sections of Armadale Road and the Kwinana Freeway in the City of Cockburn (the Proposal). The Proposal is to: realign and extend Armadale Road from Solomon Road to North Lake Road; duplicate and upgrade intersections along Armadale Road between Solomon Road and Ghostgum Avenue; construct a new bridge and on/off ramps over Kwinana Freeway; and construct a southbound collector... MoreClosed 6 September 2018 -
Kondinin Wind and Solar Farm
Kondinin Energy Pty Ltd is proposing to construct and operate up to 46 wind turbines, an accompanying 125 ha of solar farm, energy storage and associated infrastructure, approximately 5 kilometres north east of Kondinin, Western Australia. The proposal will be established encompassing parts all or part of 19 freehold rural lots comprising approximately 3,105 hectares. MoreClosed 2 September 2018 -
Gogo Station Irrigated Agricultural Development - Environmental Scoping Document
Gogo Station Pty Ltd proposes to clear and develop up to 8,355 hectares of land for irrigated cropland and associated infrastructure. Surface irrigation water is to be sourced from overland flow from within Gogo Station and overbank flows from the Margaret River. The proposal is located near the Margaret River (a tributary of the Fitzroy River), approximately 10 kilometres east of Fitzroy Crossing, in the Shire of Derby-West Kimberley. The draft Environmental Scoping Document... MoreClosed 13 August 2018 -
Greenbushes Lithium Mine Expansion
Talison Lithium Australia Pty Ltd (Talison) is proposing to expand the existing Greenbushes Lithium Mine that has been operated for over 30 years, to increase the production of spodumene ore and lithium mineral concentrate from the operation. This proposal is an expansion of the existing mining operation and has not previously been assessed by the EPA. The mine is located in the South West of Western Australia, immediately south of the town of Greenbushes, approximately 250 km... MoreClosed 30 July 2018 -
Thornlie-Cockburn Link
The Public Transport Authority (PTA) proposes to construct and operate a new 14.5 kilometre (km) dual railway track to extend the existing Thornlie passenger line to Cockburn Central Station on the Mandurah line and duplicate the existing 3 km of single track between Beckenham Junction and Thornlie Station. The proposal requires the relocation of 11 km of freight line within the existing rail reserve. The proposal requires the construction and operation of two new stations at Ranford... MoreClosed 19 June 2018