731 results
-
AutoHaul Project - Construction Activities for Rail Infrastructure within the Millstream-Chichester National Park
Robe River Mining Co Pty Ltd has proposed part of an upgrade of the existing rail network on tenements L47/126, L47/102 and L47/228 (also referred to as the 'Auto Haul Project'). This portion of the project will be located adjacent to the existing railway corridor within the MCNP and will traverse the Harding Dam Catchment area. MoreClosed 18 December 2012 -
Public Environmental Review - Turee Syncline Iron Ore Project
Hamersley Iron Pty. Limited proposes to develop a new iron ore mine and associated infrastructure at the Turee Syncline deposit, located approximately 30 kilometres north-east of Paraburdoo in the Pilbara region of Western Australia. Hamersley Iron Pty. Limited is a wholly-owned subsidiary of Rio Tinto Iron Ore. The Proposal will involve the construction and operation of a greenfield mine site and associated infrastructure. Mining will consist of a series of open pits with additional... MoreClosed 17 December 2012 -
Request to declare a derived proposal for Browse LNG Precinct from Woodside Energy Ltd
The EPA has received a referral of a proposal from Woodside Energy Ltd (Woodside) and a request that the proposal be declared a derived proposal identified in Ministerial Statement 917 for the Browse LNG Precinct Strategic Proposal. Having received this referral and request, the EPA is required to consider whether to declare the referred proposal to be a derived proposal under section 39B of the Environmental Protection Act 1986 . In making its decision whether to declare the referred... MoreClosed 4 December 2012 -
Ellen Brook Nutrient Stripping Wetland System
The Swan River Trust is planning to construct a series of nutrient stripping wetland basins in the Ellen Brook floodway in Belhus on Lot 81 and Lot 44, immediately north of the West Swan Road bridge. This project will also involve bank stabilisation and floodway restoration including weed control and revegetation. MoreClosed 3 December 2012 -
Buckland Project - Iron Ore Mine, approximately 45 km south-southwest of Pannawonica, Shire of Ashburton
Proponent: Iron Ore Holdings Limited. The proposal involves mining, processing and delivery of iron ore in the Pilbara region of Western Australia. MoreClosed 30 November 2012 -
Cape Preston East - Iron Ore Export Facilities, approximately 70 km south-west of Dampier, Pilbara Region
Iron Ore Holdings Limited intends to plan, construct, and operate from the first stage of a new multi-user iron ore export facility at Cape Preston East. The facility will have an initial capacity of 10 Mtpa, with expandability to 20 Mtpa and will be vested in the Dampier Port Authority under the Port Authority Act 1999. MoreClosed 19 November 2012 -
Gravel Extraction Lot M1822 on Diagram 8755 Horton Road, Woottating, Shire of Northam
The Capital Recycling wishes to extract gravel from the Lot and replace the excavated area with inert fill. The volume of gravel available to extract is estimated at 212000 m3 over an area of 10.5 ha from the Lot, sporadically over a period of 5 to 6 years. MoreClosed 19 November 2012 -
Wannamal 3D Seismic Survey over Gingin Gas Field, Shire of Gingin
Empire Oil & Gas NL proposes to conduct a three dimensional (3D) Seismic Survey over the Gingin Gas Field. MoreClosed 8 November 2012 -
Draft Forest Management Plan 2014-23
The draft Forest Management Plan 2014–2023 is now open for public submissions until 7 November 2012. MoreClosed 7 November 2012 -
Boonanarring Mineral Sand Mine, approximately 15 km North of Gingin
The Proposal is to undertake conventional dry mining (open cut over a period of 8 years, to extract mineral sands from the deposit area. MoreClosed 1 November 2012 -
Public Environmental Review - Aged Care Facility Development, Armstrong Reserve, Dunsborough – Cape Care
Ray Village Aged Services (Inc) trading as Capecare is proposing to develop a 1.28 ha portion of Armstrong Reserve, Naturaliste Terrace, Dunsborough in order to construct an aged care facility. The proposal will require clearing 9020m2 of native vegetation. The proposed aged care facility will consist of an adult day care centre, independent and supported living accommodation units, administration offices and community facilities including meeting rooms for the CWA. MoreClosed 29 October 2012
731 results.
Page 25 of 25