Andover Lithium Project
Azure Minerals Pty Ltd (Azure) proposes to develop and operate the Andover Lithium Project (the Proposal), located approximately 35 kilometres (km) southeast of Karratha, immediately south of the town of Roebourne (Ieramugadu), in the Pilbara Region. The Proposal is wholly located within the Native Title Determination Area of the Ngarluma People. The Proposal is a greenfield operation comprising mining and processing of lithium ore to produce lithium oxide (Li2O) and tantalum pentoxide... MoreClosed 28 June 2026 -
Tabba Tabba Project
Wildcat (Tabba) Pty Ltd proposes to construct and operate the Tabba Tabba Project (the Proposal) located approximately 50 kilometres (km) southeast of Port Hedland in the Pilbara region. The proposal is located within the Nyamal Native Title Determination Area. The Proposal is to mine spodumene, petalite and tantalum from six ore bodies via both open pit and underground operations through conventional drill and blast methods. The processing of product would be through a 4.5 million... MoreClosed 30 June 2026 -
Cataby Power Station
The Proposal is a gas-fired power station - connected to the State-owned South West Interconnected System through the Yandin Terminal Substation. The Proposal will consist of one gas turbine and ten reciprocating engines and is designed to generate up to 400 MW of electricity during periods of peak demand. The Proposal is to be located on freehold land approximately 135 km north of Perth, within a 43 ha development envelope. There will be two entry and exit points from Mimegarra Road,... MoreClosed 14 July 2026 -
Kojonup Wind Farm Development
The proposal is for the development of the Kojonup Wind Farm (KWF), consisting of 33 wind turbine generators (WTGs), a battery energy storage system (BESS), substation and associated infrastructure. A series of access tracks and corridors for underground cabling will connect the wind turbines, BESS and substation. The proposal includes an approximately 20 km underground 132 kV transmission line which will connect the proposed substation to the existing Kojonup substation. The proposal... MoreClosed 19 July 2026 -
Twin Hills Wind Farm
The proposal is for the construction and operation of a renewable energy facility located 30km north-east of Eneabba, within the Shire of Three Springs. The proposal involves the construction and operation of up to 93 wind turbines, a Battery Energy Storage System (BESS) (up to 500MW) and associated infrastructure. The proposal will connect to the South-West Interconnected System (SWIS) via an existing transmission line. The location of the proposal is land... MoreClosed 3 August 2026 -
Katanning Gold Project - Additional Information
Ausgold Exploration Pty Ltd is proposing to construct and operate an open cut gold mine approximately 275 km southeast of Perth and 37 km northeast of Katanning, WA. An Environmental Review Document (ERD) has been prepared by Ausgold Exploration Pty Ltd in accordance with Environmental Protection Authority procedures and is released for public review. The Level of Assessment was set at Referral Information with Additional Information (3 weeks public review). The additional... MoreClosed 9 August 2026 -
Draft Western Swamp Tortoise Environmental Protection Policy 2026
The EPP protects the habitat critical to the survival of the only naturally occurring population of the Western Swamp Tortoise remaining in the wild. The review of the WST EPP 2011 has considered the latest scientific information available on the Western Swamp Tortoise; land developments; and threatening processes that have occurred since the policy was last reviewed. The review also assessed the effectiveness of the existing EPP in protecting habitat values. The proposed... MoreClosed 10 August 2026 -
The White Well Gold Project
Lake Austin Mining Pty Ltd propose to expand and operate the existing White Well Gold Project (proposal), located approximately 30 kilometres east of Cue in the Murchison region of Western Australia. The proposal includes expansion of the existing open pit to a maximum depth of 90 metres below ground level, development and operation of gold processing facilities, a waste rock landform, tailings storage facility, mine dewatering and groundwater abstraction infrastructure, landfill... MoreClosed 7 September 2026 -
Wodgina Lithium Project Expansion
The proposal is an expansion of the existing Wodgina Lithium Project located approximately 110 km south of Port Hedland in the Pilbara region of Western Australia. The proposal involves development of new and expansion of existing mine infrastructure allowing operations to continue for an anticipated life of mine of approximately 19 years from 2028 (until 2047). The proposal includes the expansion of an existing pit, waste rock landform amalgamation, construction of a new... MoreClosed 9 September 2026 -
Caves Road Yallingup Sand Extraction
Cape Sand Supplies Pty Ltd proposes to extract, screen, and haul sand from a site located adjacent to Wyadup Road, approximately 5.5 km south of Yallingup. The proposal includes the development of a 9.14 ha sand mine over five stages across a five-year period, with an excavation to a depth of up to 14 m below ground level. The proposal will result in the disturbance of 0.25 ha of native vegetation, with no groundwater extraction or dewatering proposed. Operations... MoreCloses today -
Ravensthorpe Nickel Project Revised Proposal - change to proposal under s.43A
First Quantum Minerals Australian Nickel Pty Ltd (FQMAN) is proposing to amend their proposal (Assessment 2100) during assessment to expand the existing extent of the Southern Mine and Processing area to accommodate an extension of their Tailing Storage Facility (TSF), known as TSF 3, provision for additional evaporation pond area, and provision for additional topsoil storage area. The proposal is located 35km East of Ravensthorpe. The referred proposal was... MoreCloses 22 September 2026 -
Mount Gibson Gold Project - Public Environmental Review
Crimson Metals Pty Ltd is proposing to develop the Mount Gibson Gold Project, located approximately 280 kilometres (km) northeast of Perth and less than 10 km east from the Great Northern Highway, in the Avon Wheatbelt region of Western Australia. Substantial mining occurred in the 1980’s and 1990’s and as a result, historical disturbance and infrastructure remain in the area. The proposal comprises the re-opening and expansion of existing open cut mines, use of existing... MoreCloses 27 September 2026 -
Winu Project - Public Environmental Review
Winu Services Pty Ltd (a wholly owned subsidiary of Rio Tinto Limited) is proposing to develop the Winu Project (the proposal). The proposal is a new copper-gold mine located approximately 300 kilometres (km) south of Broome and 320 km east of Port Hedland in the northern Pilbara region of Western Australia. An Environmental Review Document (ERD) has been prepared by Winu Services Pty Ltd in accordance with Environmental Protection Authority (EPA) procedures and is released... MoreCloses 22 October 2026 -
Gascoyne Gateway Marine Complex - Public Environmental Review
Gascoyne Gateway Ltd proposes to build, own and operate a multipurpose marine complex in Exmouth that will service a variety of vessels including but not limited to cruise liners and associated ecotourism activities, Defence and marine supply vessels. The project will not be utilised for livestock or iron ore. The Proposal site is located 10 kilometres south of the Exmouth township and immediately south of the Ingram Street light industrial area; opposite the Exmouth landfill... MoreCloses 16 November 2026