  • Warrawoona Gold Project

    The Warrawoona Gold Project, located approximately 20km south of Marble Bar, will abstract ore from an open pit and underground mine at the Klondyke deposit as well as a cutback of the existing Copenhagen pit. Ore will be processes at around 2Mtpa at Klondyke. The project will produce gold bar and gold concentrate and is expected to operate for approximately six years. The proposal would include a total disturbance of 398 hectares. More
    Closed 17 November 2019
  • Ravensthorpe Gold Project - Public Environmental Review

    ACH Minerals proposes to develop the Kundip Mine Site located approximately 17 km south-east of Ravensthorpe in the Shire of Ravensthorpe. The proposal involves the development and operation of a gold and copper mine including open cut and underground mining, processing facilities, waste rock landforms, a tailings storage facility and associated infrastructure. The project will have an 8 year mine life and a disturbance area of 244.7 hectares including 197.8 hectares of native... More
    Closed 29 October 2019
  • Lake Way Sulphate of Potash Project

    Salt Lake Potash Limited propose to abstract Sulphate of Potash (SOP) rich brines to produce up to 260 kilotonnes per annum (ktpa) of SOP product. The proposal is located in and around Lake Way, approximately 25 kilometres south of Wiluna. The activities and infrastructure proposed includes evaporation ponds, brine abstraction trenches, paleochannel brine production bores, permanent brine pumps/pipework, access and infrastructure corridors and excess salt disposal areas. ... More
    Closed 29 October 2019
  • Tonkin Highway, Guildford Road to Great Eastern Highway Upgrade

    The Commissioner of Main Roads is proposing to upgrade the section of Tonkin Highway between Guildford Road (Bayswater) and the Great Eastern Highway (Belmont). The key components of the project are: construction and operation of two new bridges over the Swan River road widening, reconfiguration, and modification of existing interchanges construction and operation of on/off ramps and collector distributor roads ... More
    Closed 14 October 2019
  • Bunbury Outer Ring Road (Southern Section)

    Main Roads Western Australia is proposing to construct and operate the southern section of the Bunbury Outer Ring Road (BORR). The proposal includes 10.5 km of freeway-standard dual carriageway, 3 km of rural distributor roads and other associated road-infrastructure. The BORR southern section will connect to the proposed northern and central sections of BORR near South West Highway, which together will complete a bypass around Bunbury City from Forest Highway to Bussell Highway. ... More
    Closed 26 September 2019
  • Rottnest Lodge Development

    The Rottnest Island Authority proposes to redevelop the Rottnest Lodge on Rottnest Island, WA. The proposal will involve the demolition and/or refurbishment of existing accommodation, the construction of new accommodation and associated infrastructure. The proposal will involve clearing of up to 0.5 ha of native vegetation within the 1.8 ha development envelope. More
    Closed 18 September 2019
  • Greater Enfield Tieback Project – Exmouth Gulf Shipping Operations

    The Conservation Council of WA (CCWA) has referred the Greater Enfield Tieback Project – Exmouth Gulf Shipping Operations on behalf of Woodside Energy Ltd (the proponent) for environmental impact assessment under section 38 of the Environmental Protection Act 1986. CCWA are concerned about the likely environmental impacts as a result of these operations in the Gulf. Public comment on the referral are welcome and will be considered by the EPA. Referral The Greater Enfield... More
    Closed 15 September 2019
  • Waitsia Gas Project Stage 2

    The Waitsia Gas Project Stage 2 is a conventional gas proposal located approximately 16km East-South-East of the Dongara-Port Denison town sites. The proposal includes clearing of up to 17 ha of native vegetation to support the following: Construction and operation of a new gas processing plant with a maximum export capacity of 250 terajoules per day; Drilling of up to 6 new production wells to supplement the existing 2 wells; Installation of a gas gathering system... More
    Closed 12 September 2019
  • Jimblebar Optimisation Project

    The Jimblebar Optimisation Project is a revision of the existing Jimblebar Iron Ore Mine approved under Ministerial Statements 683, 809 and 857. The Revised Proposal is for mining operations at Jimblebar, located approximately 40 km east of the town of Newman. Mining of iron ore deposits will be undertaken above and below the water table. Mining operations will include open pits, overburden storage areas and the construction and operation of associated mine,... More
    Closed 11 September 2019
  • Scarborough Project Nearshore Component - Additional information

    The Scarborough Proposal would include the following activities: • shore crossing site preparation including installation of temporary facilities along the shoreline at the Pluto LNG Facility to facilitate the installation of the trunkline in shallower depths • preparation works associated with the installation of the trunkline including dredging and ... More
    Closed 9 September 2019
  • EPA Greenhouse Gas Emissions Assessment Guidance – Consultation

    The Environmental Protection Authority (EPA) is calling for community and industry input on how it should consider greenhouse gas emissions when assessing significant proposals in Western Australia. The EPA wants to ensure its assessment guidelines on greenhouse gas emissions provide an appropriate framework for developing its advice to Government. All submissions are welcome and will be considered by the EPA when drafting its greenhouse gas guidelines. ... More
    Closed 2 September 2019
  • Broome Town Beach Groyne and Jetty Upgrade Project

    The Shire of Broome is proposing to undertake an upgrade of the Town Beach Jetty as part of a set of upgrades to Broome’s Town Beach, in the Kimberley region of Western Australia. The Broome Town Beach Groyne Upgrade and Jetty Project includes upgrades to the existing groyne and the construction of a new concrete jetty extending offshore from the groyne. Piling works associated with the construction for the new concrete jetty and fishing platform would be undertaken during... More
    Closed 28 August 2019
  • Brockman Syncline Proposal

    The Brockman Syncline proposal is located approximately 60 km west-north west of Tom Price, in the central Pilbara region of Western Australia. The proposal includes up to 9,977 ha of native vegetation clearing to support the development of new and above water table mining areas in order to sustain mining at three existing operations; NammuldiSilvergrass Brockman 2 Brockman 4 The proposal includes, but is not limited to the... More
    Closed 22 August 2019
  • Tonkin Highway, Guildford Road to Hepburn Avenue

    The Commissioner of Main Roads is proposing to undertake modification works within the existing Tonkin Highway Road Reserve between Guildford Road and Hepburn Avenue. The proposed modification works allow for: Future upgrade of Tonkin Highway to a four lane ‘all-lane-running’ scenario Future construction and operation of a mass transit system within the Tonkin Highway media by other agencies. The proposed modification works will... More
    Closed 15 August 2019
  • Sand and Clay Extraction, 1728 Great Northern Highway, Bullsbrook

    Brikmakers (BGC Australia Pty Ltd) propose to extract clay and sand at Lots 5 and 6 (1728) Great Northern Highway, Bullsbrook. The majority of the site has been previously cleared of vegetation as it was historically used for the grazing of cattle. Several stands of native trees are located mostly to the west of Lot 5 and to the north of Lot 6. The total excavation area will be 26 hectares, which includes the clearing of 7 hectares of native vegetation ... More
    Closed 15 July 2019
  • Worsley Mine Expansion – Revised Proposal

    South32 Worsley Alumina Pty Ltd currently operates the Boddington Bauxite Mine (located approximately 5km south-west of Boddington), Worsley Refinery (located approximately 15 km north-west of Collie) and port operations at the Bunbury Port. The new proposal is for the: expansion of the existing mining area and incorporation of new mining areas; development of a bauxite transport corridor; development of a contingency mining... More
    Closed 9 July 2019
  • Yanchep Rail Extension: Part 2 – Eglinton to Yanchep - Public Environmental Review

    The Public Transport Authority (PTA) proposes to construct and operate an extension of the existing Joondalup railway line from a point north of the proposed future Eglinton Station. The proposal will extend the Joondalup railway line through to Yanchep in the City of Wanneroo and includes a new intermodal transit station within the Yanchep City Centre area. The development envelope is up to 73 hectares (ha) and the proposal will result in potential impacts to native vegetation... More
    Closed 8 July 2019
  • Asian Renewable Energy Hub - Public Environmental Review

    NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 662,400 ha... More
    Closed 24 June 2019
  • North West Shelf Project Extension – Environmental Scoping Document

    Woodside Energy Ltd., as operator for and on behalf of the North West Shelf Joint Venture (NWSJV), proposes the ongoing operation of the North West Shelf (NWS) Project to enable the long-term processing of third-party gas and fluids and NWSJV field resources through the NWS Project facilities (Karratha Gas Plant) until around 2070. Woodside Energy Ltd., has prepared the draft Environmental Scoping Document (ESD) in accordance with Western Australian Government procedures and is... More
    Closed 20 June 2019
  • Bunbury Outer Ring Road (Northern and Central Sections)

    The Commissioner of Main Roads Western Australia is proposing to construct and operate the northern section and upgrade the central section of the Bunbury Outer Ring Road (BORR). The proposal includes 19km of freeway-standard dual carriageway and associated interchanges between Forrest Highway and Boyanup-Picton Road (northern section) and between Boyanup-Picton Road and South West Highway (central section). The proposal would involve clearing of up to 119.3 hectares of... More
    Closed 20 June 2019
  • Perdaman Urea Project – Environmental Scoping Document

    Perdaman Chemicals and Fertilisers Pty Ltd (Perdaman) is proposing to establish a state of the art Urea Production Plant within the proposed Burrup Strategic Industrial Area, approximately 8 km from Dampier and 20 km north-west of Karratha on the north-west coastline of Western Australia (WA). A draft Environmental Scoping Document (ESD) has been prepared by Cardno on behalf of Perdaman in accordance with Western Australian Government procedures and is released for public review. ... More
    Closed 19 June 2019
  • Thornlie-Cockburn Link - Referral Information with Additional Information

    The Public Transport Authority (PTA) proposes to construct and operate a new 14.5 kilometre (km) dual railway track to extend the existing Thornlie passenger line to Cockburn Central Station on the Mandurah line and duplicate the existing 3 km of single track between Beckenham Junction and Thornlie Station. The proposal requires the relocation of 11 km of freight line within the existing rail reserve. The proposal requires the construction and operation of two new stations at Ranford... More
    Closed 17 June 2019
  • Corunna Downs Project

    Atlas Iron Pty. Ltd (the proponent) propose to develop the Corunna Downs Project (the proposal), an iron ore project located in the Pilbara region of Western Australia. The proposal includes the development of five open pits using conventional drill and blast, load and haul methods. 23.3 million tonnes of iron ore will be mined above the watertable over an approximate timeframe of 6 years. Associated infrastructure will include waste rock dumps, a mine operation centre,... More
    Closed 13 June 2019
  • Demolition and reconstruction of the Esperance Tanker Jetty

    The Shire of Esperance propose to demolish the heritage listed Esperance Tanker Jetty as it has fallen into disrepair and no longer deemed economically viable for the Shire to maintain. The Shire proposes to build a replacement jetty in close alignment with the old structure and extending 400m of its original 512m length. The old piles of the Tanker Jetty will be retained in-situ at mean sea level for the length of the old structure and three meters below the lowest... More
    Closed 10 June 2019
  • Learmonth Pipeline Fabrication Facility

    Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The onshore pipeline fabrication site and associated infrastructure includes two Bundle tracks (approximately 10 km in length) along which the... More
    Closed 26 May 2019
  • Cleanaway Banksia Road Landfill – New Tailings Storage Cell

    The proposal involves the construction and commissioning of a new tailings storage cell (Cell 12A) for the storage of lithium processing tailings at the Banksia Road Waste Management Facility (Banksia Road WMF) located at Lot 2 on Plan 65861, Crooked Brook in Western Australia (WA). It is proposed that Cell 12A will have the capacity to contain approximately 522,000 tonnes of tailings. More
    Closed 21 May 2019
  • Perth Seawater Desalination Plant 2

    The Western Australian Water Corporation is proposing to construct the Perth Seawater Desalination Plant 2 (PSDP 2) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The PSDP2 Proposal will be located within the Kwinana Industrial Area, approximately 38 km south of the Perth Metropolitan Area, on Lot 1864, Riseley Road in Naval Base. PSDP2 will be... More
    Closed 20 May 2019
  • Revised Proposal for the Roy Hill Iron Ore Mine

    The Revised Proposal outlines a significant increase in ground disturbance to that previously approved, a revised materials management strategy, a Life of Mine water management strategy including Managed Aquifer Reinjection, a significant increase in dewatering volumes and establishment of permanent surface water diversion structures. More
    Closed 19 May 2019
  • Myalup-Wellington Dam Project – Stage 1 (Works above the Wellington Dam)

    The proposal aims to reduce the flow of high salinity river water entering Wellington Dam and improve the quality of dam water for irrigated agriculture in the Collie and Myalup irrigation districts. The proposal is to construct a weir, pump stations and pipeline infrastructure and take saline water from the Collie River East Branch of the Upper Collie River, construct and operate a reverse osmosis Water Treatment Plant and supply desalinated water to the Water Corporation via... More
    Closed 9 May 2019
  • Mesa H Proposal (Revision to Mesa J Iron Ore Development) - Public Environmental Review

    Robe River Mining Co. Pty. Ltd (a wholly owned subsidiary of the Rio Tinto Group) is proposing to extend the life of and eventually replace the Mesa J Iron Ore Development through the development of a new iron ore deposit at Mesa H, located to the west of the existing mine. The proposal is located approximately 16 kilometres south west of Pannawonica in the Pilbara region of Western Australia. The proposal will require mine dewatering, surplus water management and an additional 2200... More
    Closed 24 April 2019
692 results. Page 10 of 24