Theia Energy No.1 Pty Ltd (the Proponent) proposes to drill two exploration wells (one vertical and one horizontal) and undertake hydraulic fracture stimulation of the horizontal well within Petroleum Exploration Permit EP493 located in the Canning Basin, 155km South-east of Broome.
The...More
The City of Fremantle and Fremantle Ports propose to undertake up to 150,000 cubic metres of maintenance and capital dredging from a portion of Fremantle Ports deep water entrance channel and nourish Port Beach with the dredged material.
The proposal footprint is 60.27 hectares, located...More
The Proposal is located 210 km south of Port Hedland and 180 km north west of Newman in the Pilbara region of Western Australia. The proposal is located within a 40,653 ha Development Envelope and will require clearing of no more than 9,628 ha of native vegetation.
The proposal includes,...More
The Proposal is located in the Pilbara region of Western Australia. CITIC Pacific Mining Pty Ltd on behalf of Sino Iron Pty Ltd and Korean Steel Pty Ltd is proposing to increase the rate of groundwater abstraction from the mine pits and discharge to the lower Fortescue River and estuary from 12...More
Australian Garnet Pty Ltd is seeking to develop a greenfields mineral sands mine located 35 kilometres south of Kalbarri, in the Mid-West region of Western Australia, within the Shire of Northampton.
The proposal would include the progressive development of above-groundwater mine pits,...More
The Eastern Metropolitan Regional Council is proposing to construct and operate an immobilisation plant, to immobilise Class V Air Pollution Control Residue (APCr) generated from offsite Waste to Energy Plants.
The immobilisation plant is proposed to be constructed at the Red Hill Waste...More
Woodside Energy Ltd (Woodside) proposes to construct and operate the Woodside Solar Facility in the Maitland Strategic Industrial Area, located approximately 15 kilometres south-west of Karratha, in the Pilbara region of Western Australia.
The proposal will generate electricity (up to 500...More
The information for Matters of National Environmental Significance: and Additional Referral Information Documentation for the above proposal is now available for public review. The public review period for this document is four weeks, commencing on 14 December 2021 and ending on 11 January...More
The Havieron Underground Mine Project (the Project) is a greenfield gold-copper deposit operated located in the East Pilbara Shire of Western Australia, and is approximately 45 kilometres (km) east of Newcrest’s Telfer Gold Mine and 450 km east south east from the town of Port Hedland.
...More
The Proposal will involve the construction and operation of a new rare earth refinery at Iluka Eneabba Mine Site, located 5 km south of Eneabba townsite and approximately 300 km north of Perth. It will produce approximately 17,500 tpa of individual rare earth oxides and carbonates. The Proposal...More
Harvey Water propose to construct and operate a pipeline and ocean outfall to dispose brine wastewater from customers located within the Kemerton Strategic Industrial Area (KSIA), Western Australia. The pipeline will be approximately 11 km in length and located between the KSIA and the Indian...More
Gascoyne Gateway Ltd proposes to construct and operate a multi-use single jetty and associated shore-based activities approximately 10 kilometres south of Exmouth on the western and eastern sides of Minilya-Exmouth Road.
The development envelope is approximately 3.8 km 2 in size and...More
The Proposal is located in the Pilbara region of Western Australia within a development envelope of 20,821 ha and clearing no more than 1,564 ha.
Onslow Iron Pty Ltd (herein MRL a wholly owned subsidiary of Mineral Resources Limited) is proposing to develop:
• A fully sealed private...More
The Department of Transport is proposing to construct a safe and accessible boating facility at the existing boat ramp site at Entrance Point, Broome.
The proposal is located within the existing Port of Broome port limits, approximately 350 metres south-west of the previously assessed...More
TRECAP Pty Ltd proposes to amalgamate, clear and provide servicing of Lots 802, 804 and 4640 on Mandurah Road, East Rockingham to facilitate future industrial development, forming 4.0157 hectares (ha) in area. These lots are adjacent to the proponent’s Lot 850 (31.0840 ha) which is already used...More
DevelopmentWA is seeking to develop the Kemerton Strategic Industrial Area (KSIA) for the purpose of industrial and infrastructure development as a strategic proposal. The KSIA is located within the Shire of Harvey, 17 kilometres north of Bunbury.
The KSIA key characteristics are:
...More
Covalent Lithium Pty Ltd propose to make changes to their existing approved lithium mine.
Changes include the construction and operation of a solar plant to provide renewable energy, changes to the tailings disposal method from a dry to a wet tailings, co-disposal of inert refinery waste...More
The City of Busselton propose to remove a layer of nutrient-rich, fine organic sediments which have accumulated throughout the lower reach of the Vasse River. The proposal is located within the City of Busselton and extends for 2.5 km from the Butter Factory Museum to the Busselton Bypass.
...More
Saracen Properties Pty Ltd (representing 5 Star Margaret River Pty Ltd and The Beach Village Pty Ltd) proposes to develop various lots along Wallcliffe Road Gnarabup for a 121 room five star resort, and beach village comprising of short-stay accommodation, residential dwellings and...More
Image Resources NL is seeking to develop a greenfields mineral sands project, located at Nambung, approximately 18 km east of Cervantes in the Wheatbelt region of Western Australia (WA). The proposal includes the progressive development of mine pits, processing facilities, groundwater bores and...More
Main Roads Western Australia (Main Roads) is proposing to build the Swan River Crossings (the Proposal). The proposal was originally referred to the EPA on 31 August 2020.
Since then, Main Roads has undertaken further investigations and decided on a final alignment for the bridges.
...More
Atlas Iron Pty Ltd is proposing to develop and operate Stage 2 of the Sanjiv Ridge Project, a satellite operation to Stage 1, which will involve the above water table mining of approximately 10 million tonnes (Mt) of iron ore from the Glen Herring deposit which is located on an adjacent range...More
Renergi Pty Ltd propose to build and operate a trial pyrolysis plant in the Shire of Collie. The rial will run for up to 2 years.
The proposal involves the treatment of municipal waste and forestry waste via pyrolysis to produce a biochar, condensed bio-oil and wood vinegar.
The...More
Strike West Pty Ltd propose to undertake a three-dimensional (3D) seismic acquisition survey within permits EP368, EP426, EP469, EP320 and L22; and acquisition of 2D seismic data along a single east-west seismic line within EP320 to tie into the existing Munganooka well. The proposal is located...More
Hamersley HMS Pty Limited (the proponent) proposes to develop two new above water table (AWT) iron ore mine pits at the Hope Downs 2 proposal, located approximately 80 km north-west of the township of Newman in the Pilbara Region of Western Australia.
The proposal includes a...More
Strike West Pty Ltd propose to extract gas from the West Erregulla gas field by constructing and operating a gathering system to connect its gas field and convey the extracted gas to an upstream separating facility. The proposal will supply gas to a third party operated gas processing facility,...More
The proposal is to develop an additional small satellite nickel deposit at New Morning. The project is located within the Shire of Kondinin, approximately 80 kilometres east of Hyden.
The proposal includes development of the New Morning deposit, waste dump, ROM pad, transport and...More
Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 in the Canning basin, within the Shire of Derby-west Kimberley.
On the 8 February 2021 the EPA decided to assess as...More
Tellus Holdings Ltd are proposing to increase the tonnage of waste accepted at the Sandy Ridge Facility from the current approved (Ministerial Statement 1078) 100,000 tonnes per annum to up to 280,000 tonnes per annum for permanent isolation in the Site’s waste disposal cells.
The...More
Ietto Farms proposes to extract sand and limestone from Lots 1498 and 1504 Finn Road, Myalup in the Shire of Harvey. The original extractive industry licence for this proposal expired in July 2014.
The proposal would extract sand and limestone from the site, to facilitate road...More